My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Impact Study Griffith Energy Storage Project <br /> 1.0 OVERVIEW <br /> Griffith Energy, LLC (Applicant) is proposing to construct and operate the 400-megawatt (MW) Griffith <br /> Energy Storage Project(Project) in San Joaquin County, California. Tetra Tech Inc. performed a technical <br /> analysis of traffic impacts related to the Project on behalf of the Applicant using the Caltrans <br /> Transportation Impact Study Guide (Guide; Caltrans 2020)which replaced the Caltrans Guide for the <br /> Preparation of Traffic Impact Studies(GPTIS; Caltrans 2002). Per the new California Environmental <br /> Quality Act (CEQA) requirements, the Guide provides direction on performing a vehicle miles traveled <br /> (VMT)analysis. This Traffic Impact Study (TIS)will focus on: <br /> • Existing traffic volumes and current local infrastructure conditions/characteristics. <br /> • Projected VMT with the presence of the Project. <br /> • Peak construction impacts during the month(s) of construction that would have the largest <br /> number of workers and deliveries as well as implications for the remaining construction process. <br /> • Post construction, operational impacts of the Project. <br /> • Discussion of the results and implications. <br /> The purpose of this TIS is to qualify and quantify impacts of construction and operations traffic to the local <br /> transportation infrastructure. It provides San Joaquin County with the information necessary for approval <br /> of the Project and to satisfy requirements of the Guide. <br /> NTETRA TECH 1 February 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.