Laserfiche WebLink
Traffic Impact Study Griffith Energy Storage Project <br /> 5.2 CONCLUSION STATEMENT <br /> The additional vehicle miles that would be traveled by workers and delivery trucks during construction of <br /> the Project is considered a less than significant impact. The Project would have no permanent impact on <br /> VMT during the operational lifecycle due to the very low maintenance and on-site staff need on a weekly <br /> basis. <br /> NTETRA TECH 11 February 2023 <br />