My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1243
>
2300 - Underground Storage Tank Program
>
PR0548639
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2024 10:04:08 AM
Creation date
9/14/2023 10:11:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548639
PE
2351
FACILITY_ID
FA0027823
FACILITY_NAME
ARCO AM/PM
STREET_NUMBER
1243
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95215
APN
10816016
CURRENT_STATUS
01
SITE_LOCATION
1243 W MARCH LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THICKEN CONCRETE SLAB TO THICKEN CONCRETE SLAB TO THICKEN CONCRETE SLAB TO CLIENT: <br /> 2 HP VARIABLE SPEED TURBINE W/ 0 0 0 2 HP VARIABLE SPEED TURBINE W/ 0 0 BELOW WHERE SECONDARY <br /> 3 GPH ELECTRONIC LEAK DETECTION BELOW WHERE SECONDARY 2 HP VARIABLE SPEED TURBINE W/ 0 0 BELOW WHERE SECONDARY 3 GPH ELECTRONIC LEAK DETECTION CONTAINMENT OF SUMP ENDS. y� <br /> CONTAINMENT OF SUMP ENDS. 3 GPH ELECTRONIC LEAK DETECTION CONTAINMENT OF SUMP ENDS. l, <br /> W/SIPHON PORT&SECOND 1 C 0 0 W/SIPHON PORT FOR VACUUM SOURCE 0 C p r <br /> VACUUM SOURCE 45"DIA.ACCESS VARIES DIMENSION REQUIRED W/SIPHON PORT FOR VACUUM SOURCE 40"DIA ACCESS (TYP.).DIMENSION REQUIRED 45"DIA.ACCESS VA ) DIMENSION REQUIRED <br /> p VARIES WITH FIELD CONDITIONS. 0 VARIES WITH FIELD CONDITIONS. 0 VARIES WITH FIELD CONDITIONS. <br /> SEE NOTES BELOW MANHOLE SEE NOTES BELOW MANHOLE SEE NOTES BELOW MANHOLE <br /> MINI HYDROSTATIC SENSOR IN MINI HYDROSTATIC SENSOR IN BRINE MINI HYDROSTATIC SENSOR IN BRINE 1-1 2 MIN.CROWN <br /> BRINE FACTORY SUPPLIED 1 1-1/2"MIN.CROWN FACTORY SUPPLIED RESERVOIR 1 1-1/2"MIN.CROWN FACTORY SUPPLIED RESERVOIR 1 /" <br /> RESERVOIR (Typ,) (Typ, (TYP.ALL OPENINGS) ALL OPENINGS) ALL OPENINGS <br /> (TYP.) (TYP. (TYP• (TYP.) (TYp. ) <br /> 6"WIDE DETECTABLE 6"WIDE DETECTABLE .,•i•�°„ 6"WIDE DETECTABLE <br /> '.,; •:. ,• UNDERGROUND MARKING UNDERGROUND MARKING p ?'•••'•' <br /> .✓,!S.-••.:: I •(• E MAGNATEC <br /> •„,:; TAPE EMPIRE MAGNATEC " .. TAPE EMPIRE MAGNATEC �.X.: ;:.'. `•may <br /> 3"PEA GRAVEL MIN.TO ''"'`' "0•'•^': ,• APE EMP <br /> "' ,,n 3 PEA GRAVEL MIN.TO 1;,r UNDERGROUND31-1431R <br /> MARKING <br /> 3"PEA GRAVEL MIN.TO ~ T <br /> 1`31-143 X31-143 � "'• <br /> PREVENT LOAD TRANSFER "'' .:• "' PREVENT LOAD TRANSFER PREVENT LOAD TRANSFER <br /> •.'• ,�_: .,'.,•.gym•... ... :..':•:'.:.,.. ..:.: <br /> TO TOP OF TANK (B"MIN. 12"MAX.) TO TOP OF TANK (8"MIN. 12"MAX.) TO TOP OF TANK (8"MIN. 12"FROM MAX.) <br /> SEAL OFF W/DRAIN 19 0 VT TUBING FROM <br /> CONTRACTOR TO INSTALL CLEVIS AND COTTER PIN 1 2-IN-1 SENSOR BOX SEAL OFF W/DRAIN 19 0 TANK GAUGE ADAPTER&CAP PRODUCT PIPING TO VAC SENSOR <br /> TANK GAUGE ADAPTER&CAP 0 6 2"BALL VALVE(TYP.) 2-IN-1 SENSOR BOX CONTRACTOR TO INSTALL CLEVIS AND COTTER PIN 2-IN-1 SENSOR BOX 1 CONTRACTOR TO INSTALL CLEVIS AND COTTER PIN <br /> 1 <br /> VEEDER ROOT.1 GPH MAGNOSTRICTIVE 3 SENSOR-NO TANK VACUUM SENSOR 04 VEEDER ROOT.1 GPH MAGNOSTRICTNE PROBE TANK J_BOX(TYP,) g 0 TANK GAUGE ADAPTER&CAP <br /> PROBE TANK LEVEL PROBE W/TLS CAP 0 04 1 ASSEMBLY KIT W/MOUNTING BRACKET J-BOX(TYP.) 8 LEVEL PROBE W/TLS CAP&RING.OVERFILL ALARM 04 0 VETOER ROOT.1 GPH MAGNOSTRICTNE <br /> &RING.OVERFILL ALARM SET®90f. 0 SET®90R CAPACITY.USE 4"FLOAT IN INSTALL KIT 2 SENSOR-NO TANK VACUUM PROBE TANK LEVEL PROBE W/TLS CAP " <br /> SENSOR-NO TANK VACUUM SENSOR 1 <br /> CAPACITY.USE 4"FLOAT IN INSTALL KR 19 SEAL OFF W/DRAIN 1 LOOP VACUUM TUBING FROM SENSOR ASSEMBLY KR W/ &RING.OVERFILL ALARM SET®90R <br /> SEMBLY KIT W/MOUNTING BRACKET <br /> 3"D.W.FRP BONDED ENTRY FITTING 7 2"x24"FLEX(TYP.) PRODUCT PIPING TO VAC SENSOR MOUNTING BRACKET CAPACITY.USE 4"FLOAT IN INSTALL KR <br /> &4"z3°CONCENTRIC REDUCER W/ 2 2 SEAL-OFF(TYP.)19 (TYP.) SEAL-OFF OYP.)19 2 1"FRP BONDED ENTRY FIRING(TYP.) <br /> 2 1"FRP BONDED ENTRY FIRING <br /> TEST PORT&PLUG 2 1"FRP BONDED ENTRY FITTING(TYP.) 1"HOMERUN TO BLDG.TURBINE POWER 1"FRP BONDED ENTRY FITTING 8 1"HOMERUN TO BLDG.TURBINE POWER /� <br /> 3"OVER 2"FIBERGLASS 1"FRP BONDED ENTRY FITTING 2 g ROBROY THROUGH SUMP ONLY (NP.) 2 (ROBROY THROUGH SUMP ONLY) AR <br /> 4 4 -- 1"POWER&MONITORING CONDUIT ( ) <br /> CROSSOVER CONTAINS ___ 8 ) 3"D.W.FRP BONDED ENTRY 1"MONITORING CONDUIT 2 2 3"D.W.FRP BONDED ENTRY <br /> VACUUM TUBING ONLY FROM z (ROBROY THROUGH SUMP ONLY) 1"MONITORING CONDUIT _ 2 2 (ROUTED TO INTERSTITIAL) g FITTING&4"x3"CONCENTRIC �NIEST COAST F'AODUCTS,LLC <br /> LOOP VACUUM TUBING TO PRODUCT CROSS CONNECT g FITTING&4"x3"CONCENTRIC -- <br /> FILL SUMP (ROUTED TO INTERSTITIAL) REDUCER W TEST PORT&PLUG (ROBROY THROUGH SUMP ONLY) z REDUCER W/TEST PORT&PLUG <br /> PIPING AND THEN ROUTED TO VAC SENSOR (ROBROY THROUGH SUMP ONLY) _ / 2"BALL VALVE 6 ----- <br /> Loop <br /> _ NO. DATE DESCRIPTION <br /> -- 2"INSIDE 3"FIBERGLASS PIPING TO 2"BALL VALVE g - --_- 4 4 3"OVER 2"FIBERGLASS - -= m q q 3"OVER 2"FIBERGLASS Q 02/03/2022 REV.PER EHD CgiRN. <br /> DISPENSERS(VACUUM MONITORED) 4 4 CROSSOVER CONTAINS VACUUM 2"x24"FLEX(NP.) 7 CROSSOVER CONTAINS VACUUM <br /> 48"DOUBLE WALL BRINE MONITORED TUBING ONLY FROM FILL SUMP 48"DOUBLE WALL BRINE FILLED TUBING ONLY FROM FILL SUMP <br /> 2 2 3"D.W.FRP BONDED ENTRY FITTING SUMP SUMP N <br /> &4"x3"CONCENTRIC REDUCER W/ 2"INSIDE 3"FRP PRODUCT MANIFOLD <br /> 3"INSIDE 4"DOUBLE WALL 5 TEST PORT&VACUUM TUBING 2"x24"FLEX(TYP.) 7 q q 2"INSIDE 3"�P PRODUCT LINE)TO TO NSI TANK(VACUUM MONITORED) �® <br /> FRP SIPHON PIPING VACUUM LOOPED BETWEEN FITTINGS&THEN DISPENSERS(VACUUM MONITORED20K <br /> MONITORED) ROUTED TO VAC SENSOR ASSEMBLY SUMP LIQUID MONITORING SENSOR SUMP LIQUID MONITORING SENSOR H <br /> H 2 3"D.W.FRP BONDED ENTRY FITTING (IN SENSOR HOLDER BELOW APEX 0 2 2 3"D.W.FRP BONDED ENTRY FITTING <br /> (r/P.) (IN SENSOR HOLDER BELOW APE) 22"MANWAY 2 W/4"x3"CONCENTRIC REDUCER W/ OF TANK AT LOWEST POINT) W/40x3"CONCENTRIC REDUCER W/ <br /> 22"MANWAY 4g"DOUBLE WALL OF TANK AT LOWEST POINT) TEST PORT&VACUUM TUBING LOOPED TEST PORT&VACUUM TUBING LOOPED <br /> BRINE FILLED SUMP TO VAC SENSOR ASSEMBLY(TYP.) TO VAC SENSOR ASSEMBLY(TYP.) <br /> 0 <br /> AUL PRODUCT,SIPHON&CROSS CONNECTION PIPING SHALL BE NOTE: NOTE <br /> SUMP LIQUID MONITORING SENSOR H INSTALLED SUCH THAT ALL PENETRATIONS LEAVE THE TANK SUMP SENSOR SHALL BE INSTALLED ON THE SAME SIDE OF PIPING SENSOR SHALL BE INSTALLED ON THE SAME SIDE OF PIPING n <br /> (IN SENSOR HOLDER BELOW APEX 0 FROM THE SAME SIDE.SUMP SENSOR SHALL BE INSTALLED U PENETRATIONS AS SHOWN PENETRATIONS AS SHOWN <br /> OF TANK AT LOWEST POINT) THE SAME SIDE OF PIPING PENETRATIONS AS SHOWN <br /> A:SECTION VIEW-25K REGULAR-ONE PUMP,ONE LINE C:SECTION VIEW-1 O COMPARTMENT DIESEL-ONE PUMP,ONE LINE E:SECTION VIEW-12K COMPARTMENT PREMIUM-ONE PUMP,ONE LINE <br /> SCALE 3/4"= 1'-0" SCALE:3/4"= 1'-0" SCALE:3/4"= 1'-0" <br /> 3"x18"FLEX CONNECTOR 7 SEAL: <br /> 4ZFROM <br /> VER 2"FIBERGLASS CROSSOVER q q 3"OVER 2"FIBERGLASS CROSSOVER <br /> AINS VACUUM TUBING ONLY FROMAIFILLVACUUM TUBING ONLY <br /> FILL SUMP 2"CAP.DRILL HOLES IN END AN INSTALL <br /> 2"CAP.DRILL HOLES IN END AN INSTALL6 I 3"D.W.FRP BONDED ENTRY <br /> LOOP VACUUM TUBING TO PRODUCT CROSS-CONNECT SUMP <br /> GROMMETS FOR TUBING PASS THROUGH 6 D.W.FRP BONDED ENTRY GROMMETS FOR TUBING PASS THROUGH I 12 2 <br /> PIPING AND THEN ROUTD TO VAC SENSOR IFITTING&4"x3"CONCENTRIC1"MONITORING CONDOR TING&4"x3"CONCENTRIC 1"MONITORING CONDOR(ROUTED REDUCER W/TEST PORT&PLUG(ROUTED TO INTERSTffIAL) g DUCER W/TEST PORT&PLUG TO INTERSTITIAL)(ROBROY 3'D.W.FRP BONDED ENTRY FITTING&4°x3" ( THROUGH SUMP ONLY) 1"CONDUIT HOMERUN TO BLDG.TURBINE N0 36475 <br /> ROBROY THROUGH SUMP ONLY) 1"CONDOR HOMERUN TO BLDG.TURBINE = 82 2 POWER (ROBROY THROUGH SUMP ONLY) 1"DOUBLE ENTRY BOOT 2 POWER (ROBROY THROUGH SUMP ONLY) * %p,6_30_2 <br /> CONCENTRIC REDUCER EN TEST PORI&VACUUM 1"FRP BONDED ENTRY FIRING 2 1"FRP BONDED ENTRY FITTING(TYP.)TUBING LOOPED BETWEEN FITTINGS&THEN 2 <br /> ROUTED TO VAC SENSOR ASSEMBLY(TYP.) M') 2 1"FRP BONDED ENTRY FITTING(TYP.) (�CP1,1F� <br /> J-BO%(TYP.) g e • e e VEEDER ROOT.1 GPH MAGNOSTRICTNE <br /> - -_ "• 04 05 VEEDER ROOT.1 GPH MAGNOSTRICTNE \� 04 0 PROBE TANK LEVEL PROBE W/TLS CAP <br /> 2°INSIDE 3"FIBERGLASS PIPING TO e e , PROBE TANK LEVEL PROBE W/TLS CAP &RING.OVERFILL ALARM SET 0 90% <br /> 4 4 &RING.OVERFILL ALARM SET 0 90% <br /> DISPENSERS(VACUUM MONITORED) e O i O CAPACITY.USE 4"FLOAT IN INSTALL KR <br /> r <br /> • • w <br /> VETOER ROOT.1 GPH MAGNOSTRICTN )E 0 04 e e CAPACITY.USE 4"FLOAT IN INSTALL KIT ® 7 2"x24"FLEX(TYP.) <br /> 7 2"x24"FLEX(TYP.) <br /> 48"DOUBLE WALL BRINE 2: <br /> PROBE TANK LEVEL PROBE W/TLS CAP �/ t w m <br /> &RING.OVERFILL ALARM SET 0 90% e, 22"MANWAY a %T ! MONITORED SUMP m <br /> • Q.DOUBLE WALL BRINE / ¢ <br /> CAPACITY. USE 4"FLOAT IN INSTALL KIT ! , g HOME RUN TO BUILDING VAC -�e MONITORED SUMP i/ U<m <br /> 3 SENSOR-NO TANK VACUUM SENSOR I e\ SENSOR (ROBROY THROUGH a -e Z g r <br /> SUMP ONLY) 2 SENSOR-NO TANK VACUUM SENSOR 2 SENSOR-NO TANK VACUUM SENSOR 1 2"INSIDE 3"FRP PRODUCT LINE TO z S m <br /> ASSEMBLY KR W/MOUNTING BRACKET " 1 q q 2"INSIDE 3"FRP PRODUCT LINE TO ASSEMBLY KR W/MOUNTING BRACKET 4 (7 0 m`"m <br /> 0 o ASSEMBLY KR W/MOUNTING BRACKET ® DISPENSERS(VACUUM MONITORED) m Z j o rn.: <br /> 2"CAP.DRILL HOLES IN END AN INSTALL 8 J-BOX(TYP.) DISPENSERS(VACUUM MONITORED) <br /> GROMMETS FOR TUBING PASS THROUGH 6 e e ;O° 2 HP VARIABLE SPEED TURBINE W/ 0 0 ---- - -- --- w O <br /> 2 HP VARIABLE SPEED TURBINE W/ 0 0 - ¢ <br /> 3"D.W.FRP BONDED ENTRY FITTING 2 2 e e--e 7 2"x24"FLEX(TYP.) 3 GPH ELECTRONIC LEAK DETECTION 3 GPH ELECTRONIC LEAK DETECTION a W m z <br /> e W SIPHON PORT FOR VACUUM SOURCE 0 0 W z r <br /> &4"x3"CONCENTRIC REDUCER W/ W/SIPHON PORT DR VACUUM SOURCE O C / w o z$ <br /> TEST PORT&PLUG 2 1"FRP BONDED ENTRY FIRING A a Z U z p e6 <br /> P. 3"D.W.FRP BONDED ENTRY FITTING LOOP VACUUM TUBING FROM 2 2 3"D.W.FRP BONDED ENTRY FITTING II m(�c7 O N <br /> 3"OVER 2"FIBERGLASS J ) LOOP VACUUM TUBING FROM 2 2 z z <br /> 4 PRODUCT PIPING TO VAC SENSOR &4"x3"CONCENTRIC REDUCER W/ Z¢m z N <br /> CROSSOVER CONTAINS L SUMP <br /> '�� PRODUCT PIPING TO VAC SENSOR &4"z3"CONCENTRIC REDUCER W/ TEST PORT&VACUUM TUBING a W w z O <br /> TUBING ONLY FROM FILL SUMP g HOME RUN TO BUILDING.TURBINE POWER TEST PORT&VACUUM TUBING LOOPED TO VAC SENSOR ASSEMBLY z z ro <br /> (ROBROY THROUGH SUMP ONLY) LOOPED TO VAC SENSOR ASSEMBLY 2"BELLxMALE ADAPTER(EYP.) 4 In-m a" <br /> NOTE VACUUM MONITORING SENSOR FOR 87 OCTANE 2"BELLxMALE ADAPTER(TYP.) 4 �,p) (TYP.) w o <br /> PRODUCT AND CROSSCONNECT PIPING IS MOUNTED IN 0 0 2 HP VARIABLE SPEED TURBINE W/ <br /> THE ,00 GALLON 87 OCTANE TANK'S TURBINE SUMP. 48"DOUBLE WALL BRINE 0 3 GPH ELECTRONIC LEAK DETECTION NOTE:THE LAST 2 FEET(MINIMUM)OF CONDUITS THAT Q c7 p <br /> MONITORED SUMP 1 O W/SIPHON PORT At SECOND VACUUM ENTER THE DOUBLE WALL SUMP SHALL BE PVC COATED z a <br /> SOURCE NOTE:THE LAST 2 FEET(MINIMUM)OF CONDUITS THAT RIGID. z <br /> ENTER THE DOUBLE WALL SUMP SHALL BE PVC COATED g <br /> RIGID. <br /> B:PLAN VIEW 25K REGULAR-ONE PUMP,ONE LINE NOTE:THE LAST 2 FEET(MINIMUM)OF CONDUITS D: PLAN VIEW-10K COMPARTMENT DIESEL-ONE PUMP,ONE LINE F:PLAN VIEW-12K COMPARTMENT PREMIUM-ONE PUMP,ONE LINE DEVELOPMENT INFORMATION: <br /> SCALE:3/4"= 1'-0" THAT ENTER THE DOUBLE WALL SUMP SHALL BE <br /> PVC COATED RIGID. SCALE 3/4" 1'-0" SCALE:3/4"=1'-0° <br /> MINI HYDROSTATIC "34"Lid O.D. <br /> SENSOR FIBERGLASS PIPING,2"NOMINAL,BONDED TO SUMP SUMP 2 WIRE <br /> OR UDC INNER WALL USING GASOLINE COMPATIBLE SHIELDED <br /> FACTORY SUPPLIED _ 32-3/4"Neck O.D. EPDXY RESIN.BOTTOM OF PIPE TO BE IN CONTACT CABLE <br /> SUMP RESERVOIR \ WITH LOWEST PART OF SUMP OR UDC. <br /> SITE ADDRESS: <br /> ( SUMP MONITOR LIQUID ADDM <br /> CONTRACTOR TO BOND UNISTRUT CHANNEL TO O SENSOR INSIDE IN WEST MARCH LANE <br /> HOLDER TO ALLOW FIBERGLASS PIPE TO CLEAR HOLDER SFOQRCN CA 962b <br /> 30"I.D. *NOTE: SUMP COLLAR"LIP'.CONTRACTOR TO USE APEX OF <br /> SLIP ON RISER CONTRACTOR SHALL BE HELD RESPONSIBLE FOR PROPER INSTALLATION& GASOLINE-COMPATIBLE EPDXY TO BOND SPACER TO I TANK <br /> ROUND BODY EXTENIROUND BODY EXTENSION PREPARATION PER MANUFACTURERS INSTRUCTIONS AND SHALL REINSTALL SUMP AND PIPE.CONTRACTOR MAY USE UNISTRUT, <br /> FIELD SEALED JOINT. SUMPS IF HYDROSTATIC TESTING SHOWS LEAKING IN THIS AREA OF THE FIBERGLASS PIPE,OR ANY OTHER EQUIVALENT <br /> SUPPLIED 48"I.D. SUMP. MATERIAL THAT CAN WITHSTAND ENVIRONMENT OF DESIGNED BY: <br /> (ADHESIVE W/Kff) SUMP. CHECKED <br /> BY: <br /> 1 e° DRAWN BY: ER <br /> SUMPS MUST BE ORIENTED SUCH THAT THE FACE OF THE SUMP PANEL IS <br /> PARALLEL WITH ADJACENT TANK SUMP PANEL IN ORDER TO ACHIEVE THE 45' TURBINE SIDE SUMP SENSORS TO BE MOUNTED DATE PROJECT N6 <br /> I / ANGLES REQUIRED TO ROUTE THE PIPING WHILE MAINTAINING THE DESIRED BELOW APEX OF TANK,AT BOTTOM OF SUMP AT FIBERGLASS O4�14)2021 7161 <br /> 3/8 X 1/4 SS PERPENDICULAR ANGLE INTO THE SUMP. SIDE OF TANK WHERE PRODUCT PENETRATIONS INTO TANK <br /> BUSHING FACTORY SUMP ARE MADE AND BELOW LOWEST PENETRATION DRAWING TITLE: <br /> INSTALLED AT LAY-UP I - FITTING WITHIN SUMP AREA PRODUCT PIPING TO FIBERGLASS SUMP TURBINE SIDE SUMPS AND PIPING <br /> j FACTORY DISPENSERS,PRODUCT PIPING CROSS CONNECTION INSIDE TANK COLLAR INSTALLATION DETAILS <br /> COLLAR BONDED BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS LIP <br /> TO TANK ARE DESIGNED TO ENTER THE SAME SIDE OF THE (SINGLE 2HP TURBINE,2022 <br /> _ O CONTRACTOR TO ADDITIONALLY GLASS WRAP&LAMINATE AT CONNECTION SUMP AS SHOWN.IF PRODUCT PENETRATION UNISTRUT 1.SENSOR HOLDER CONFIGURATION D.W.VENTNAPOR) <br /> a JOINT DETAILS - -� FOLLOWING CURING OF ADHESIVE.SPECIFIC ATTENTION MUST BE GIVEN TO CHANNEL BONDED TO UNISTRUT <br /> ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD <br /> I SURFACE PREP AS TESTING REQUIREMENTS WILL DETECT THE SMALLEST OF CONDITIONS,THEN DUAL SENSORS AT TURBINE CHANNEL SHEET N6 <br /> FLAWS.ALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE,GASOLINE SUMP WILL BE REQUIRED TO BE INSTALLED. <br /> t WITH (ET MTBE(METHYL TERTIARY-BUTYL ETHER),OR GASOLINE WITH 10% 2.SENSOR HOLDER GALVANIZED FITTINGSCONTRACTOR TASUREQUIR RSE ENAL <br /> QUIRED <br /> ETCHCOVE(ETHANOL).FIBERGLASS AND RESIN MUST EXTEND 1/2"BEYOND AND UNISTRUT MINIMIZE BENDS IN FLEXIBLE CONNECTORS <br /> --- COVERAGE OF ADHESIVE. CHANNEL BONDED TO M-5.3-13 <br /> 48"DIA POLYGON SUMP BODY 1/4"DRAIN/TEST BUSHING. SUMP WALL.DO NOT <br /> G:DOUBLE WALL TURBINE SUMP RISER (8-20"X 19"FLAT PANELS) FACTORY INSTALLED PENETRATE SUMP! NOTE:INDICATES ITEMS FOUND ON <br /> SCALE:NTS H:SUMP SENSOR HOLDER DETAILS XX MATERIALS LIST SHEETS M.5.3.01 &M.5.3.02 <br /> SCALE:1"=1'-O" <br />
The URL can be used to link to this page
Your browser does not support the video tag.