My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1243
>
2300 - Underground Storage Tank Program
>
PR0548639
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2024 10:04:08 AM
Creation date
9/14/2023 10:11:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548639
PE
2351
FACILITY_ID
FA0027823
FACILITY_NAME
ARCO AM/PM
STREET_NUMBER
1243
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95215
APN
10816016
CURRENT_STATUS
01
SITE_LOCATION
1243 W MARCH LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J Q Q Q U IN Environmental Health Department <br /> COUNTY <br /> Greorness grows here. <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM/PM -BP 7161 Date: 10/09/2023 <br /> Address: 1243 W MARCH LN , STOCKTON 95215 <br /> Requestor: ROBERT VELASCO,A&S ENGINEERING Telephone: (661)250-9300 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0083940 <br /> Inspection Type: 298-UST SERVICE REQUEST- FIELD ACTIVITY <br /> Onsite Service Technician: Ariel Barrantes ICC Service Tech/Installer Exp. Date: 08/11/2025 <br /> Manufacturer training: NOV, 12/04/23 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the following inspection: <br /> - Witnessed pressure testing of product,vapor recovery,vent, and chase piping-Passed <br /> - Witnessed soap testing of all piping joints and penetrations- Passed <br /> - Verified secondary piping slope for all piping- Passed <br /> - Verified pipe setbacks, crossovers, and burial depth-Passed <br /> - Witnessed integrity testing of all sumps- Passed <br /> - Verified brine type and witnessed initial brine addition in sumps and UDCs-Passed <br /> Note: Please be aware that the facility can't operate or receive fuel in the 87, 91, and diesel tanks prior to the EHD inspection <br /> and approval.Additional inspections are required. Please refer to the approval letter dated 6/20/2023 for a list of inspections <br /> needed. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Emailed to Latham Zubillaga, Contrac <br /> EH Specialist: SHEWIT WOLDEAREGAY Phone: (209)616-3063 <br /> SR0083940 SC298 10/09/2023 <br /> EHD 23-01 Rev.07/05/2022 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.