My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1243
>
2300 - Underground Storage Tank Program
>
PR0548639
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2024 10:04:08 AM
Creation date
9/14/2023 10:11:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548639
PE
2351
FACILITY_ID
FA0027823
FACILITY_NAME
ARCO AM/PM
STREET_NUMBER
1243
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95215
APN
10816016
CURRENT_STATUS
01
SITE_LOCATION
1243 W MARCH LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I ISIV I Environmental Health Department <br /> U IN 1 y <br /> . Gre�trless grows he, . . <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM/PM -BP 7161 Date: 04/08/2024 <br /> Address: 1243 W MARCH LN , STOCKTON 95215 <br /> Requestor: ROBERT VELASCO,A&S ENGINEERING Telephone: (661)250-9300 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0083940 <br /> Inspection Type: 298-UST SERVICE REQUEST- FIELD ACTIVITY <br /> Onsite Service Technician: David Rouse ICC Service Tech/Installer Exp. Date: 07/15/2024 <br /> Manufacturer training: VR, 07/28/24;VMI, 02/01/26; OPW, 09/24/24 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the following: <br /> -Witnessed leak detector testing on the 87, 91 and diesel <br /> -Witnessed monitoring system functionality <br /> Vacuum zones are not built to approved plans. Please submit updated plans for approval.Vacuum zones and end point <br /> communications to be re-verified after updated plan approval. <br /> Additional items to be submitted to EHD. Please see approval letter dated June 20, 2023 item number 12 for items to be <br /> completed. <br /> Facility is not approved to operate. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Emailed to Miguel Ceja, Field Super, <br /> EH Specialist: CAROL PRESTO Phone: (209)616-3061 <br /> SR0083940 SC298 04/08/2024 <br /> EHD 23-01 Rev.07/05/2022 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.