Laserfiche WebLink
Overfill Prevention Equipment Inspection <br /> .114Tanknology OPW 61 and 71 Series Overfill Prevention Device Inspection <br /> Date: 8/7/2023 <br /> Customer Name: Jones covey Group, Inc. <br /> Location#: CHEVRON 99280 <br /> Location Address: 1222 W Atherton ,Manteca ,CA, 95337 <br /> OPW Model Number: 71 SO <br /> REGULAR PREMIUM DIESEL <br /> PART 1)Proper height setting calculation <br /> Maximum Tank Volume per:Tank Chart Agallons 19782.000 15041.000 11904.000 <br /> Max shut off requirement for Flapper is 95% a 95% 0.95 0.95 0.95 0.95 <br /> Multiply Maximum tank volume by 95% c gallons 18792.900 14288.950 11308.800 <br /> Use tank chart to determine height of calculated volume D inches 103.000 104.750 101.125 <br /> Measure top of fill riser threads,or face seal adapter when used,to tank top E inches 43.500 44.750 48.000 <br /> Tank diameter From Chart Finches 118.380 118.380 118.380 <br /> Upper Tube in tank(G) F-D=G G inches 15.380 13.630 17.255 <br /> Subtract 2 inches from upper tube in tank G-2"=H H inches 13.380 11.630 15.255 <br /> Calculated minimum upper tube length(1)H+E=I i inches 56.880 56.380 63.255 <br /> Actual measured upper tube length (Without fill J inches 56.875 56.375 63.250 <br /> adapter)(J) <br /> PART 2)Device certification criteria evaluation <br /> Criteria 1 Yes Yes Yes <br /> Does the overfill prevention device meet the 95%requirement? <br /> Criteria 1 a If the final shutoff volume is installed greater than 95%,is there at <br /> least 250 gallons of ullage above the overfill device activation point NA NA NA <br /> to ensure that none of the tank top fittings are exposed to product, <br /> meeting the criteria established in EPA 280.20iic and per OPW <br /> installation guidelines. <br /> Criteria 2 Is the Actual measured upper tube length 6.5 inches Yes Yes Yes <br /> or more than the fill riser?(J must be 6.5"or more <br /> than E) <br /> Criteria 3 Does the overfill prevention device function as <br /> required?(Inspect the device for damage, Yes Yes Yes <br /> contamination,freedom of movement, <br /> weakening due to wear and corrosion) <br /> PART 3)Device Certification PASS/FAIL <br /> Pass Pass Pass <br /> Technician certifies that the device is operationally <br /> compliant. <br /> Comments: <br /> Signature of Technician: Date: 8/7/2023 <br /> Landon Zamora <br /> WO: NW1-2363644 <br />