My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:38:22 PM
Creation date
9/19/2023 1:46:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Test Method Developed by x Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure x Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg <br /> Tank ID T1: 87 T2: 87/91 <br /> Tank Manufacturer XERXES XERXES <br /> Tank Capacity 19,703 10369/11849 <br /> Test Start Time 1:05 P.M. 1:30 p.m. <br /> Initial Reading -12" Hg -12" Hg <br /> Test End Time 2:05 p.m. 2:30 p.m. <br /> Final Reading -12" Hg -12" Hg <br /> Change in Reading 0" Hg 0" Hg <br /> Pass/Fail Criteria +/-0" Hg +l-0" Hg <br /> Tightness Test Results x Pass ❑ Fail x Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by x Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type x Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID #1 87 Master #2 87 Syphon #3 87M/91 #4 87 Syp/91 <br /> Pipe Manufacturer SMITH SMITH SMITH SMITH <br /> Test Start Time 10:56 a.m. 11:05 a.m. 11:32 a.m. 11:42 a.m. <br /> Initial Reading 5 psi 5 psi 5 psi 5 psi <br /> Test End Time 11:56 a.m. 12:05 p.m. 12:32 p.m. 12:42 p.m. <br /> Final Reading 5 psi 5 psi 5 psi 5 psi <br /> Change in Reading 0 psi 0 psi 0 psi 0 psi <br /> Pass/Fail Criteria No loss No loss No loss No loss <br /> Tightness Test Results x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fail <br /> Pipe Run ID #5 91 <br /> Pipe Manufacturer SMITH <br /> Test Start Time 11:55 a.m. <br /> Initial Reading 5 psi <br /> Test End Time 12:55 p.m. <br /> Final Reading 5 psi <br /> Change in Reading 0 psi <br /> Pass/Fail Criteria No loss <br /> Tightness Test Results x Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> 8. SUMP/UDC TEST <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.