Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard x Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum x Hydrostatic <br /> Test Equipment Used:Caldwell Level Change Indicator <br /> Sump/UDC ID 87 M FILL SU 87 S FILL SU 91 STP SUMP 91 FILL SUMP <br /> Sump Manufacturer XERXES XERXES XERXES XERXES <br /> Sump Depth (inches) 78" 77 112" 76" 78" <br /> Sump Bottom to Top of 37" 42" 60" 38" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 2:10 p.m. 3:50 p.m. 1:15 P.M. 3:00 p.m. <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 2:40 p.m. 4:20 p.m. 1:45 p.m. 3:30 p.m. <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> ass Fail Criteria .005130 min. .005130 min. .005130 min. .005130 min. <br /> Tightness Test Results x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> ass Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />