My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:51:14 PM
Creation date
9/19/2023 2:01:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder-Root TLS-350 PLUS! 336.02 <br /> Attach the post-certification reports if the monitoring system is capable of generating <br /> eitherxMonitoring System Set-up xAlarm History Report Yes No NA: <br /> All monitoring equipment is operational per manufacturer's specifications? x ❑ <br /> Secondary containment systems arefree of damage, debris, or liquid? x ❑ <br /> Are the audible and visual alarms operational? x ❑ <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks andresidual buildup on x ❑ ❑ <br /> floats; and 2)tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the secondary x O O <br /> containment? <br /> The monitoring system set-up was reviewed,and proper settings confirmed? x O O <br /> Was the monitoring control panel's backup battery visually inspected, functionally tested, x ❑ O <br /> and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under-dispenser x ❑ <br /> containment? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring x ❑ ❑ <br /> system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring <br /> system detects a release?Which sensors initiate positive shut down? (Check all that X ❑ ❑ <br /> apply)xSump xUDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all communication ❑ ❑ x <br /> equipment operational? <br /> Describe all answers marked "No"or"Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.