Laserfiche WebLink
MOUNTAiN HOUSE MASTFR PLAN <br /> 5.4.3 Capital Facility Costs <br /> Schools <br /> The total cost of K-12 school facilities required to maintain the standards set forth <br /> in this chapter is approximately $131.8 million. Of this total, $72,7 million will be <br /> needed for K-8 core facilities,vehicles and equipment: $54.9 million relates to high <br /> school facilities, vehicles and equipment; and$4,2 million will be used to pay for <br /> temporary and permanent administrative space, food service facilities, and <br /> corporation yards. These cost estimates assume dedication of improved school <br /> sites. <br /> Section 5.4.1: School Phasing, sets forth the school facility phasing program for <br /> Mountain House. Generally, school facilities will be phased based on student <br /> generation with the objective of minimal temporary facilities usage for K-8 students. <br /> Because there is a minimum number of high school students that must be <br /> generated prior to opening a neW 5000i,there is more dependence on temporary <br /> housing at existing 9.12 Facilities prior to opening the first phase of a new high <br /> school in Mountain House_ <br /> There is a conservative cost allowance for school buses and other vehicles <br /> ccnsidering that the Neighborhoods have been designed so that roost students are <br /> within walking distance of their school The proposed community transit system <br /> will also provide service between schools for magnet and special education <br /> programs. <br /> A dotailed breakdown of school facility mts and phasing assumptions is provided <br /> in the Public rinancing Plan(PFP). <br /> Library <br /> More than $7 million have been included in the cost estimates for library facilities. <br /> The cost estimate assumes that the library site will be dedicated. Funding for a <br /> central library includes a 21,000 square foot central facility,a minimum of 118,000 <br /> books and periodicals, and a bookmobile. <br /> 5.4.4 Operations and Maintanance <br /> Schools <br /> School operations in California are primarily funded by a State allocation to each <br /> school district that is determined based on average daily attendance (ADA) at <br /> district facilities. Because ADA, and therefore State funding, will increase as <br /> Mountain Rouse develops, it is assumed that this revenue source will pay for <br /> operational costs associated with the new schools. However.in the first couple of <br /> years prior to student generation and a corresponding increase in State funding, <br /> detailed facility plans must be prepared for both K-8 and 9-12 facilities, <br /> 7"he cask of these pians will exceed the proportional ADA funding that Will be <br /> available from the initial enrolled student population. In addition, L.ammersville <br /> dri fiedglementary School District will need to hire a facility planner to assist <br /> i n the <br /> Chapter Five Page 5.14 <br /> Resolution Template 01/2023 <br />