Laserfiche WebLink
Mountain House Specific Plan III <br /> 5.2Z Community College <br /> The Delta College Project is projected to be constructed in four phases over a 20-year time frame. <br /> The initial enrollment at the completion of Phase 1 would be 3,540 students, increasing to an <br /> enrollment at full buildout of 12.000 siudenis.At full buildout,it is anticipated there would be 557,004 <br /> gross square feet of development at the site,4,040 parking space and 532 faculty and staff employed <br /> at the College. An additional 10.9acre parcel adjacent to Mountain House in Alameda County has <br /> been acquired to buffer the college from n"O>y agricultural operations. <br /> 5.2.5.1 Implementation Measurea <br /> a The applicant shall maintain a temporary bufferwithin the community to include a 100-fact setback <br /> between the edge of development and ongoing agricultural operations as the project builds out. <br /> K Improvement Plans to be approved by Design Consistency Review Committee (DCRC) and <br /> Mountain House Community Services department (MHCSID) prior to onsite construction or <br /> grading. <br /> a <br /> She plan and architectural elevations are subject to DCRC review prior to onsite construction or <br /> grading. <br /> d Delta Community College shall provide bus servlcefor Neighborhood AIB students In accordance <br /> with Its ngreemani with t.l1SD, <br /> 5.3 Child Care Provisions <br /> 5.3.1 Master Plan Summary <br /> The Master Plan requires a minimum of three (3)orae-acre child care canters within iha community, <br /> situated to evenly serve the population. pay and after school child care facilities are encouraged to <br /> locate within the community at sites which are easily accessible to residents and workers, and which <br /> ' are appropriate for child care uses. Such sites include K-8 schools, neighborhood centers, village <br /> centers, business parks and nearby other commercial and public facilities. The MHCSD and t_USD <br /> are working together to provide a childcare faclIIty at each neighborhood K-8 school, <br /> 5.3.2 Specific Plan III Description <br /> Child care facliities are to be provided at K-8 schools by LUS❑ in coordination with MHCSD. Child <br /> care facilities are also expected to be located in Community College,and within the Industrial Park. <br /> 53.3 Implementation Measures <br /> If the operator of the child care facility is a non-profit organization,the land shall be dedicated at no <br /> cost to the organization as described In the public lands equity program in the Public Financing Plan, <br /> If a private or non-profit organization is selected as the child care operator,the lands will he sold or <br /> leased by the private land owner at a discounted value,with the conditional agreement that the <br /> ................. .......... ..... ................................-, ...,....,..............,................. <br /> . <br /> 5-6 Re*O 11Wit 9,October 18.2D22 <br /> Resolution Template 01/2023 <br />