My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015838
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NASERGHOLI
>
125
>
2600 - Land Use Program
>
PA-2300145
>
SU0015838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2024 5:06:07 PM
Creation date
9/21/2023 10:06:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015838
PE
2687
FACILITY_NAME
PA-2300145
STREET_NUMBER
125
Direction
E
STREET_NAME
NASERGHOLI
STREET_TYPE
AVE
City
MOUNTAIN HOUSE
Zip
95391-
APN
20906051
ENTERED_DATE
9/21/2023 12:00:00 AM
SITE_LOCATION
125 E NASERGHOLI AVE
RECEIVED_DATE
9/20/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mounl*mmuoxpe.611c Plan|III <br /> ---_ ..............—...................--...... _-----................... ^^~^.—^—~----.................... <br /> acentral feature in each resUential nelghborhood and mthe planning area asowhole. Therefore, <br /> park development will ocnur on a continual basis as growth takes place to keep up with. or precede, <br /> thudensmd from residents. <br /> The Community Park will bodeveloped inphases. The initial grading and|mmdmomping oythe park wiU <br /> take p|ace mtthe samotime mnadjyoantres|deN|m|oryanon*developed. Facilities wNhinthe park will <br /> be Donstructal a8 demand arises or as spedfied by the MHCSD consiqtent wIt1h Its Parks. <br /> Recreation and Lni�,uwaPlan. Additional,Joint use facilities provided bythe community oo||agawill bu <br /> provided as the community college is constructed ounnisten|vNth mgn:omnNo hntwewn the college <br /> m|strict and the MH C_9 1) <br /> &||NeigNhorhmpdParks are schedu|od fordawa|vpmwntiacommunvehalf-way thmmOhthe maidanUo| <br /> development of eac» nelg»ummouu The Initial grading�Lnulandscaping mthe Neighborhood Pomo <br /> will We p|nma at the nnmvt/mn as adjacent schools or residential areas amdavo)opoV Facilities <br /> within the Nebghborhood ParkG will be constructed as demand ar[ses or as speciffiod by the MHCSD <br /> | oonsiotentWith Its adopted Park5.Recx,mVonand Lnioum^Plan. <br /> Open space areas will boprovided uoadjacent development proceeds. Maintenance ofpublic parks <br /> and recreational facilities Will be provided by the MHCSD. Open o»aoe areas not dedicated W thu <br /> MHGSOwi|| be maintained through developer or homeowner agnememtnwith the MHCGD. by a <br /> maintnnmnc.e district orhomeowners association. <br /> All)n'traot|amdsnapin0and utility(ight.n(wayuromoand all other landscape areas thatwmmnot inthe <br /> or|p1no| Mmster P|nn nndohned by M HCGD within SP ||| will mquire afundi Ing mechanism Tbnoo <br /> areas will require ostam|&hmontofu maintenance entity or financing moohonimm a000ptuh|emothe <br /> MHGSDto pum|dnfunding for muinterionooof.and ifnecessary.replacement utthe and vy"uvnf(A| <br /> ffe vyimpmvmnwm(s These Improvements inv|adebut are not limited to, landscaping. pathways, <br /> walls, and all improvomoutonmmingorforthospecial benefit ofSIP Ill. The financing mechanism shall <br /> hocompleted and adopted bythe Board ofDirectors u/iartothe filing ofthe Final Mmp <br /> vu.o.o.o Storm Drains <br /> Storm drainage and flood protection fac||1t|oswill be conntfuotedetthe same time uothe streets and <br /> other mIInfrastructure and*i||bomaintained hythe 1VHCStDAmaintenance and operation plan <br /> forthe detention too|mand flood protection facilities shall bnprepared and accepted by the MHC8o <br /> p,iortothe approval ofthe first final map inNeighborhood/VB Maintenance personnel,vehicles,and <br /> owm|pmam|maybeoAmrod with othnrfax|||wmmiirte inmnoncrews tomohieve staff iIng aff/oionoyand cost <br /> reduo0ono. There maintenance costs have been imoo,wo,utad inthe fisu| analysis presented In the <br /> PFPand the MoCSoFiscal Analysis. <br /> 16.2.2.4 Energy and Communications <br /> Fleotrical power distribution will be installed on an as-needed basis as part of the on-site roadways. <br /> The initial service line extensioris.will require ac-celerated planning and construcAlon to mincidle wJth <br /> the start uYmuidou*a|damelopmout- <br /> -----------------_------------------.~.~~.^~^.-------- <br /> 16'a <br />
The URL can be used to link to this page
Your browser does not support the video tag.