My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015842
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
19300
>
2600 - Land Use Program
>
PA-2300150
>
SU0015842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 8:02:20 AM
Creation date
9/21/2023 10:15:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015842
PE
2611
FACILITY_NAME
PA-2300150
STREET_NUMBER
19300
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391-
APN
20906068
ENTERED_DATE
9/21/2023 12:00:00 AM
SITE_LOCATION
19300 W GRANT LINE RD
RECEIVED_DATE
9/20/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J OAQ U I N COMMUNITY DEVELOPMENT DEPARTMENT <br /> N � COUNTY MOUNTAIN HOUSE <br /> Greatness grows here. MAJOR & MINOR SUBDIVISION <br /> WATER SUPPLY Information concerning Byron Bethany Irrigation District(BBID)annexation of all property in <br /> the proposed subdivision; water conservation measures; and water storage and <br /> distribution. <br /> WATER TABLE Information on water table management and continued water and drainage service for <br /> MANAGEMENT agricultural uses. <br /> STORM DRAINAGE Information on storm drainage facilities and phasing, storm drain master plan; flood zones; <br /> and Best Management Practices (BMP's)as per the Drainage Plan. <br /> PUBLIC SERVICES Information on the provision, design, phasing and timing of all public services; financing <br /> procedures for public services to serve the proposed subdivision, including <br /> medical/emergency services, school design and phasing, and MHCSD annexation of all <br /> land within the proposed subdivision. <br /> WASTE Information on waste management services to be provided, including information on the <br /> MANAGEMENT waste transfer station. <br /> PARKS Information on neighborhood park(s), community park(s), and regional park(s), including <br /> location and phasing of these and associated facilities. <br /> STEP 3 APPLICATION DECLARED COMPLETE <br /> Staff will check your application. If anything is missing, you will be notified in writing. The <br /> applicant will be sent a postcard once the application has been determined complete. (Your <br /> application cannot be processed until it is complete.) <br /> STEP 4 APPLICATION PROCESSING <br /> CEQA The County will determine if the proposal may have an adverse effect on the environment. <br /> If no adverse effects are identified, the application will be processed. If there are potential <br /> adverse effects, further environmental review will be required. Projects that have the <br /> potential to adversely affect the environment will require the preparation of an EIR. <br /> REFERRALS AND Staff will refer the application to any County departments, other agencies and surrounding <br /> ACTION property owners affected by your proposal. At the end of a review and comment period a <br /> staff report will be prepared and the Planning Commission will make the required findings <br /> and take action on the application. <br /> FINAL ACTION The action of the Planning Commission can be appealed to the Board of Supervisors. The <br /> Planning Commission's action is final unless appealed. For further information on the <br /> length of the appeal period, contact the staff. <br /> STEP 5 CONDITIONS AND ADDITIONAL PERMITS <br /> CONDITIONS The staff will send you the final action after the appeal period and if it is approved, it will list <br /> conditions by department, that must be met before you can file a final map. <br /> FINAL MAP A final map must be approved by the County Surveyor within 36 months of approval of the <br /> tentative map. For each approved final map, an AutoCAD file shall be submitted to the <br /> Community Development Department. (The AutoCAD file shall contain the following layers: <br /> parcel lines, survey monuments [with annotation of x, y coordinates of each monument], <br /> easements, street center lines, and an annotation layer consisting of lot number, lot square <br /> footage, and lot dimensions. The AutoCAD file shall be a dxf file, in State Plane Coordinate <br /> System Zone 3, NAD 83 datum, with feet as units. A Word document describing each layer <br /> shall also be submitted with the AutoCAD file.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.