Laserfiche WebLink
i:; liaii•ot�l�nental k-#ea{th ge�a���et�t <br />.,.. s,„_ ...: .: �� .......... <br />Corrective Action Statement <br />RE: September 20, 2023, Hazardous Waste inspection report <br />For each violation listed below, indicate if the violation has been corrected or will be corrected by a certain dale. Also, <br />describe what was done to correct the violation in the space provided below each violation. Submit this completed torr^ <br />with the Retum to Compliance Certification within 30 days of inspection. If you have any questions, please contact <br />Michael Suszycki at (209) 598-7001 or msuszycki@sjgov.org. <br />MIRACLE MILE MARKET, 244 W HARDING WAY, CERS ID: 10180779, PR0518369 <br />Violation #302 -Failed to have all communication or alarm systems, spill control, or decontamination <br />equipment. <br />1� This violation was corrected ❑This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #403 -Failed to keep hazardous waste containers closed except when adding or removing <br />hazardous waste. <br />@� This violation was corrected <br />❑ SupT^ming documents included <br />❑ This violation will be corrected by (date): <br />Describe ac�ions taken or will be taken to correct violation: <br />s <br />we P�►�' 1. <br />Violation #404 -Failed to inspect hazardous waste storage areas at least weekly. <br />l� This violation was corrected <br />❑ Supporting documents included <br />❑ This violation will be corrected by (date): <br />Describe actions taken or will be taken to correct violation: <br />Page 3 of 4 <br />