Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared. <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: Charter Way Chevron 508 W Charter Way Stockton,CA 95706 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY <br /> A=ANNULAR Sensor TLS *PIPING <br /> F=FILLS <br /> . . . . . . (ARROWS) <br /> V=VAPOR . . . . . . . Store Drawing of <br /> P=PROBE ' ' ' ' ' ' ' piping exit of <br /> L=Turbine/Leak Detector . . . . . . . sump and UDC's. <br /> X=SUMP SENSOR . . . . . . . No underground <br /> B—Brine Sensor . . . . . . drawing is <br /> S=Smart Sensor ' ' ' ' ' ' ' accurate,we <br /> C=Floats&Chains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . cannot speculate <br /> E=E Stop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . blueprint <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . \I I)✓-' <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . LTX O OO . . . <br /> . . . <br /> C . . . . . . . . . . . . . C . . . . . . . . . . . . . 87 . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . LTX . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . 91 O O O . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . C . . . . . . . . . . C . . . . . . . . . LTx <br /> . . . . . . . . . . . . . . . . . . . . . . . . . 87 O O "O <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Charter Way <br /> _drys•Nems iva3ngnxad;]rd ara�vof iisiSia fa;Is csri[l�iixg laclnicime me a <br /> 7r-�assromi'oprfaae or��arxfira sde{�'.fu"Ir�orrxuiaraxlPrrr�cv�-D+rni'rlg <br /> nv;la scda <br /> Date map was drawn 10/7/20 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,it installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />