Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-2300151 <br /> SEAN & SAM INC . / SAC WIRELESS <br /> Administrative Use Permit Application No . PA-2300151 was approved by the Community Development <br /> Department on November 15 , 2023 . The effective date of approval is November 15 , 2023 . This approval <br /> will expire on November 25 , 2026 , which is thirty-six ( 36 ) months from the effective date of approval , <br /> unless ( 1 ) all Conditions of Approval have been complied with , ( 2) all necessary building permits have <br /> been issued and remain in force , and ( 3 ) all necessary permits from other agencies have been issued <br /> and remain in force . <br /> Unless otherwise specified , all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits . Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application . Ordinance requirements cannot be modified , and other ordinance requirements may <br /> apply . <br /> 1 . COMMUNITY DEVELOPMENT DEPARTMENT ( Contact : [209] 468 - 3121 ) <br /> a . BUILDING PERMIT : Submit an " APPLICATION - COMMERCIAL BUILDING PERMIT" . The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect . This Plan must show drainage , driveway access details including gates , on - site <br /> parking , landscaping , signs , existing and proposed utility services , and grading ( refer to the " SITE <br /> PLAN CHECK LIST ' for details ) . Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit application . A <br /> fee is required for the Site Plan review . ( Development Title Section 9 - 802 . 110 [ a] [2] ) <br /> b . APPROVED USE : This approval is for a 105400t monopole telecommunications facility Site Plan <br /> dated September 18 , 2023 . The project also includes the installation of ancillary equipment within a <br /> 900 square foot leased area . ( Use Type- Communications Facility — Tower) <br /> c . CAPITAL FACILITY FEE : This project may be subject to the Capital Facility Fee . If the Capital <br /> Facility Fee is applicable , the County shall collect the fees before the issuance of any building <br /> permits . ( Development Title Section 9 - 610 . 070 ) <br /> d . SETBACKS : The structure shall comply with the following setback requirements ; <br /> 1 . The freestanding tower , and associated antennas , shall be setback .a minimum of 105 feet from <br /> property lines . ( Development Title Section 9411 . 050 [c] [ 1 ] ) <br /> e . CONCEALMENT : All facilities must be designed to visually blend into the surrounding area . <br /> ( Development Title Section 9 - 411 . 050 [ a] [ 6] ) <br /> f . LIGHTS : Unless otherwise required under FAA or FCC regulations , applicants may install only <br /> timed or motion - sensitive light controllers and fully - shielded lights such that the light source is not <br /> directly visible from any adjacent residential land uses . All aircraft warning lighting must use lighting <br /> enclosures that avoid illumination impacts on residential land uses to the maximum extent feasible . <br /> ( Development Title Section 9 - 411 . 050 [ a] [ 1 ] ) <br /> g . FENCES , ENCLOSURES AND SECURITY : The facility must comply with the following standards . <br /> ( Development Title Section 9 - 411 . 050 [a] [ 6 ] ) <br /> 1 . No barbed wire , razor ribbon , electrified fences or any similar measures shall be allowed to <br /> secure a wireless facility , unless the applicant demonstrates to the satisfaction of the Approval <br /> Authority that the need for such measures significantly outweighs the potential danger to the <br /> PA- 2300151 — Conditions of Approval 1 <br />