My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 1:28:51 PM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 RPT OF FACILITY INFO
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction & Demolition/Inert Debris Facility Report <br /> Tracy Material Recovery& Transfer Facility <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> Material Type Final Disposition <br /> onsite compost facility, or added to residual <br /> pile if no markets. <br /> Plastics Collected and baled at MRF building for <br /> delivery to brokers or processors, or added to <br /> residuals. <br /> Materials Management and Storage <br /> Table 19 — Materials Management— Storage and Removal Method <br /> Material Type Storage and Removal Method <br /> 3/4 inch AB specification Stockpile on-site not to exceed 12 months or <br /> 30,000 cubic yards. Removal via transfer trailer <br /> or other vehicle. <br /> 3/8 inch utility sand Stockpile on-site not to exceed 12 months or <br /> 10,000 cubic yards. Removal via transfer trailer <br /> or other vehicle. <br /> Scrap Metal Stockpile or two 40-cyd bin storage on-site for <br /> floor sorting, and at least two bins or a bunker <br /> will be placed under Processing Line once <br /> installed. One bin next to Inert Processing Area <br /> and the other next to the C&D Operations Pad. <br /> Tracy MRF to arrange transfer and delivery to <br /> local metal broker for further processing and <br /> baling, within 7 days of processing. As tonnages <br /> increase, a transfer trailer will be used. Storage <br /> will not exceed 1,000 tons. <br /> Wood Wood debris stockpiled on perimeter of C&D <br /> Processing Area during floor sorting. At least <br /> two 40-cyd bins or a bunker will be placed <br /> under Processing Line once installed. Tracy <br /> MRF to grind onsite or arrange transfer and <br /> delivery to local organic processor for grinding <br /> within 30 days of processing. As tonnages <br /> increase, a transfer trailer will be used to <br /> transfer wood chips. Chipped wood will be <br /> removed within 30 days of grinding. Removal <br /> will be via transfer trailer or other vehicle. <br /> Storage will not exceed 7,000 cubic yards. <br /> 34 170.18 CDI FacReport 060613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.