Laserfiche WebLink
t, Additional information concerning the design and operation of the facility shall be furnished upon request and within the time frame <br /> specified by the LEA. <br /> k <br /> u. The maximum permitted daily tonnage for this facility is 1,800 tons per day,and shall not receive more than this amount without k <br /> a revision of this permit. <br /> V. The proposed bio-mass operation shall process wood waste as descnbed in the TPR. <br /> w. This facility shall not exceed the maximum daily traffic count of 1,245 trips per day without revision this permit. is <br /> x. Food waste shall not exceed more than 15%of the co-composted elongated windrows and shall not exceed more than 40%of the <br /> material composed in the enclosed or aerated static piles. <br /> y. A copy of this permit shall be maintained at the facility. <br /> z. A noise study shall be required in the event that complaints are received by the LEA regarding the noise generated by the facility <br /> operations.The noise study would need to be conducted within 180 days of the first verified complaints. <br /> aa. The LEA must be notified in writing 7 days in advance of non-routine changes in operations at this facility. <br /> i <br /> r <br /> i <br /> i <br /> I <br /> Page 5 of 5 <br /> i <br />