My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 1:28:51 PM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 RPT OF FACILITY INFO
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g) The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of each building permit application. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolutions R-00-433) <br /> h) The Regional Transportation Impact Fee shall be required for this development. The fee is due <br /> and payable at the time of each building permit application. The fee is based on the current <br /> schedule. (Resolution R-06-38) <br /> i) Drainage from the site shall be retained on-site by a retention basin and meet the requirements <br /> of San Joaquin County Development Standards. Retention ponds shall be fenced with six(6) <br /> foot high chain link fence or equal when the maximum design depth is 18 inches or more. <br /> Required retention basin capacity shall be calculated by a registered civil engineer,licensed <br /> contractor or an architect prior to release of Building Permit. (Development Title Section 9- <br /> 1135.9) <br /> j) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> k) Applicant shall submit Permit Registration Documents(PRD's)to the State Water Resources <br /> Control Board(SWRCB)and subsequently submit the Waste Discharge Identification(WDID) <br /> Number to the Department of Public Works prior to issuance of any building permits. <br /> 1) Prior to the issuance of the first building permit,the applicant shalt pay Public Works <br /> $30,000.00 to be used for the interim repairs to MacArthur Drive. <br /> 3) ENVIRONMENTAL HEALTH(Staff Contact:Ted Tasiopoulos:(209)953-7698) <br /> a) Submit to the Environmental Health Department revised site plans showing the maximum <br /> number of employees and customers the sewage disposal system is being designed for. In <br /> addition,show on revised plans that the leach field area will be barricaded so it cannot be <br /> driven over, parked on,or used as a storage area. This leach field area must be used for that <br /> specific purpose only,and it cannot contain any underground utility lines(San Joaquin County <br /> Development Title, Section 9-1110A(c)(5)). In addition,the revised site plan shall incorporate <br /> the 100%designed sewage disposal replacement area. <br /> b) If the existing septic system is determined to be inadequate for the proposed expansion, then <br /> construction of an individual sewage disposal system(s)under permit and inspection by the <br /> Environmental Health Department is required at the time of development(San Joaquin County <br /> Development Title,Section 9-1110.3&9-1110.4). - <br /> The following comments refer specifically to Solid Waste Facility Permit#39-AA-00-24: <br /> c) The project description indicates that it is being submitted in the form of a Transfer Processing <br /> Report(TPR)format and includes a Report bf Compost Site Information (RCSII document.The <br /> two documents are being evaluated as a proposed project description only.The documents will <br /> require further review during the Solid Waste Facility Permit(SWFP)process. <br /> d) The project description indicates on Page ES-7 that the facility will operate 24 hours per day. <br /> The document does not include an analysis for impacts from noise and lighting. Provide an <br /> analysis of the impacts regarding noise and lighting. <br /> e) The project description proposes to increase hours of operation,vehicle traffic,tonnage and <br /> building size.The discussion regarding facility design is not adequate.The proposed increases <br /> in waste and traffic Volumes are 2.5 and 3 times the existing approved volumes.The increase <br /> Conditions of Approval -5- PA-0800005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.