My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 1:28:51 PM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 RPT OF FACILITY INFO
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure <br /> Implementing Timing of <br /> i Method of Verification Party Verification Monitoring Party <br /> AIR QUALITY AND ODORS <br /> ...................... —------ <br /> The following mitigations would be The applicant shall iApplicant Prior to the San Joaquin County <br /> required: provide the Community issuance of Planning Department <br /> The construction contractor shall Development I <br /> the building and San Joaquin Valley <br /> implement the following fugitive dust Department with permits and Air Pollution Control <br /> control measures in addition to.the San documentation as throughout District's <br /> Joaquin Valley Air Pollution Control required by the Air the duration <br /> I District's Regulation VIII, Fugitive PM10 Pollution Control of the 111 <br /> Prohibitions (Rules 8011 through District project. <br /> 8081),during all ground-disturbing <br /> 1 activities within the project area: <br /> • Disturbed Areas:The <br /> construction contractor shall <br /> effectively stabilize for fugitive <br /> dust control all disturbed areas <br /> that are not being actively used <br /> for construction purposes, <br /> using water or nontoxic <br /> chemical <br /> stabilizers/suppressants. <br /> • Storage Piles:The construction <br /> contractor shall apply water or <br /> nontoxic chemical <br /> stabilizers/suppressants for <br /> fugitive dust control,or cover <br /> storage piles With a tarp or <br /> other.suitable cover or <br /> vegetative ground cover. <br /> Following the addition of <br /> materials to or the removal of <br /> materials from the surface of <br /> outdoor storage piles,said piles <br /> I shall be effectively stabilized for <br /> fugitive dust emissions, using <br /> sufficient water or,nontoxic <br /> chemical <br /> stabilizer/suppressant. <br /> • Unpaved Roads:The <br /> I construction contractor shall <br /> effectively stabilize for fugitive <br /> dust control all onsite unpaved <br /> roads and offsite unpaved <br /> access roads using water or <br /> nontoxic chemical <br /> stabilizers/suppressants. <br /> Conditions of Approval PA-0800005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.