Laserfiche WebLink
a-e) The applicant indicates the hours of operation for the facility will be Monday-Sunday, 24 <br /> hours a day;seven (7)days a week.The facility will accept commercial loads from 4:OOa.m. <br /> to 6:00 p.m.and self-haul loads from 6:00 a.m.to 6:00 p.m., Monday through Saturday. <br /> Based on a proposed volume of 2,500 tons per day of incoming solid waste,a total of 1,727 <br /> vehicles per'day,or 1,167 additional vehicles per day are expected. The Department of <br /> Public Works required a Traffic Impact Analysis be prepared to determine traffic impacts on <br /> the level of service for MacArthur Road, Linne Road/MacArthur Road; Linne Road/Chrisman <br /> Road; Linne'Road/Corral Hollow Road; and Linne Road/Tracy Boulevard. MRO Engineers <br /> submitted the Final Traffic Impact Analysis to the Public Works Department on December <br /> 17,2008.The analysis and the Public Works Transportation Division determined that any <br /> impacts to existing levels of'service from the proposed expansion project would be less <br /> than-signif cant. . . ; <br /> The project site boundaries fall within the comprehensive airport land use plan for Tracy <br /> Municipal Airport (TMA). The nearest runway of the TMA is approximately one mile west of <br /> the existing project site.This application is to expand the existing Materials Recover Facility <br /> and a portion of the project falls within the Traffic Pattern Zone for the TMA. The project <br /> sponsor shall abide by the applicable Airport Land Use Plan for Tracy Municipal Airport and <br /> the Federal Airport Administration Advisory Circular No: 15015200-33B, Hazardous Wildlife <br /> Attractants On or Near Airports. Therefore the proposed expansion project will have less <br /> than a significant impact on airport imaginary surfaces. <br /> Less Than <br /> r t• Significant <br /> Potentially With Less Than <br /> Significant Mitigation Significant No <br /> Issues: :eft E Impact incorporated Impact Impact <br /> XVI. UTILITIES AN03.SERVICE SYSTEMS. <br /> Would,the project:: <br /> a) Exceed wastewater treatmentn. <br /> ElX. <br /> requirements of the Central <br /> Valley,+�egional Water Quality ' <br /> Control Board? <br /> b) Requ-06 or result'in the ' ° n El X n <br /> construction of new water'or <br /> wasteWdter treatment facilities ; <br /> or ex dn"sion of existing <br /> facilities, the construction of <br /> which could cause significant <br /> environmental effects? <br /> C) Require_or result in the El El X, <br /> constfPction of new storm <br /> water:clrainage facilities or <br /> expargsion of existing facilities, <br /> the construction of which could <br /> cause significant environmental <br /> effects? <br /> s d) Have sufficient water supplies El � X ❑ <br /> available to serve the project <br /> from p*isting entitlements an t <br /> resourcgs,or are new or • <br /> expanded entitlements 'w <br /> needed? <br />