My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2023 RPT OF FACILITY INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS_2023 RPT OF FACILITY INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 11:59:22 AM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2023 RPT OF FACILITY INFO
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a-e) The applicant indicates the hours of operation for the facility will be Monday-Sunday, 24 <br /> hours a day;seven (7)days a week.The facility will accept commercial loads from 4:OOa.m. <br /> to 6:00 p.m.and self-haul loads from 6:00 a.m.to 6:00 p.m., Monday through Saturday. <br /> Based on a proposed volume of 2,500 tons per day of incoming solid waste,a total of 1,727 <br /> vehicles per'day,or 1,167 additional vehicles per day are expected. The Department of <br /> Public Works required a Traffic Impact Analysis be prepared to determine traffic impacts on <br /> the level of service for MacArthur Road, Linne Road/MacArthur Road; Linne Road/Chrisman <br /> Road; Linne'Road/Corral Hollow Road; and Linne Road/Tracy Boulevard. MRO Engineers <br /> submitted the Final Traffic Impact Analysis to the Public Works Department on December <br /> 17,2008.The analysis and the Public Works Transportation Division determined that any <br /> impacts to existing levels of'service from the proposed expansion project would be less <br /> than-signif cant. . . ; <br /> The project site boundaries fall within the comprehensive airport land use plan for Tracy <br /> Municipal Airport (TMA). The nearest runway of the TMA is approximately one mile west of <br /> the existing project site.This application is to expand the existing Materials Recover Facility <br /> and a portion of the project falls within the Traffic Pattern Zone for the TMA. The project <br /> sponsor shall abide by the applicable Airport Land Use Plan for Tracy Municipal Airport and <br /> the Federal Airport Administration Advisory Circular No: 15015200-33B, Hazardous Wildlife <br /> Attractants On or Near Airports. Therefore the proposed expansion project will have less <br /> than a significant impact on airport imaginary surfaces. <br /> Less Than <br /> r t• Significant <br /> Potentially With Less Than <br /> Significant Mitigation Significant No <br /> Issues: :eft E Impact incorporated Impact Impact <br /> XVI. UTILITIES AN03.SERVICE SYSTEMS. <br /> Would,the project:: <br /> a) Exceed wastewater treatmentn. <br /> ElX. <br /> requirements of the Central <br /> Valley,+�egional Water Quality ' <br /> Control Board? <br /> b) Requ-06 or result'in the ' ° n El X n <br /> construction of new water'or <br /> wasteWdter treatment facilities ; <br /> or ex dn"sion of existing <br /> facilities, the construction of <br /> which could cause significant <br /> environmental effects? <br /> C) Require_or result in the El El X, <br /> constfPction of new storm <br /> water:clrainage facilities or <br /> expargsion of existing facilities, <br /> the construction of which could <br /> cause significant environmental <br /> effects? <br /> s d) Have sufficient water supplies El � X ❑ <br /> available to serve the project <br /> from p*isting entitlements an t <br /> resourcgs,or are new or • <br /> expanded entitlements 'w <br /> needed? <br />
The URL can be used to link to this page
Your browser does not support the video tag.