Laserfiche WebLink
Item No. 2 <br /> . PC: 12-16-93 <br /> -r ER-93-1/UP-93-4 <br /> 'Page 6 <br /> Y <br /> the woodand yard waste processing and composting area, and all refuse tipping,'sorting and <br /> processing will take place within-the 30-foot-d6ep ekcavated pit. <br /> There are two primary types of land uses in the area surrounding the project site, gravel mining <br /> and agriculture, Lone Star Industries operates a sand and gravel mining facility west of the site, <br /> with Teichert Aggregates operating a similar facility to the north. Directly.across MacArthur Drive <br /> to the east are orchards and a field presumably used for-row crops. The.property to the south <br /> of the site is vacant agricultural land. Other land uses in the Area includ.0•fields of row craps and <br /> the Royster•Tire Storage and Recycling facility to the west. The Banta-Carbona Irrigation District <br /> canal runs along the western boundary of the site. Corral Hollow Creek Js also located north of <br /> the site: <br /> There are few residences in the project-area. The closest are the two mobile homes located <br /> across MacArthur Drive,approximately 600 feet northeast of the site. There-is also one residence <br /> approximately 1.4 miles South of the site on the west side of MacArthur Drive. There are also <br /> scattered residences at the intersection of Linne Road and MacArthur Drive,north of the site. <br /> The Final BR concluded that the project is not like to create land use conflicts with surrounding <br /> P ] iY g <br /> f fl' uses; either agricultural, residential, or resource extraction. The project will be enclosed with a <br /> six-foot high chain-link fence and landscaped along MacArthur Drive. Also,except for the wood <br /> - _• and yard waste processing and composting,all other operations will take place inside the transfer <br /> station building. This,.combined with the.project's locatlon in the bottom of the 30-toot-deep pit, <br /> t <br /> will.minimize land use conflicts. <br /> Property owners in the area were mailed notices of Draft EIR availability, as well as project <br /> referrals. No comments from neighbors were received on the Draft EiR., and no comments <br /> regarding the Draft EiR were made by the one neighboring property owner present at the hearing <br /> on the Draft EIR. <br /> Traffic/Circulation: <br /> The Final EIR prepared for the project did not identify any significant traffic related impacts. The <br /> proposed project is expected to generate approximately 500 daily trips initially and approximately <br /> 1,100 daily trips in 2010. Since the trips will likely be dispersed over an entire day, according to <br /> the FEiR there is We relative impact to other users of the local transportation system. <br /> FACiLiTIESJSERViCES: <br /> Drainage, <br /> Storm water runoff from all areas except the wood storage and yard.waste composting area will <br /> drain to an on-site retention pond. Storm water runoff from the wood storage.and yard waste <br /> I compost area will drain to an on-site lined evaporation pond. Water used for periodic wash dawn <br /> i of the transfer station floor will be collected and directed to holding tanks for temporary storage <br /> until pumped out and hauled off the site for disposal. <br />