My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2023 RPT OF FACILITY INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS_2023 RPT OF FACILITY INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 11:59:22 AM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2023 RPT OF FACILITY INFO
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br /> . PC: 12-16-93 <br /> -r ER-93-1/UP-93-4 <br /> 'Page 6 <br /> Y <br /> the woodand yard waste processing and composting area, and all refuse tipping,'sorting and <br /> processing will take place within-the 30-foot-d6ep ekcavated pit. <br /> There are two primary types of land uses in the area surrounding the project site, gravel mining <br /> and agriculture, Lone Star Industries operates a sand and gravel mining facility west of the site, <br /> with Teichert Aggregates operating a similar facility to the north. Directly.across MacArthur Drive <br /> to the east are orchards and a field presumably used for-row crops. The.property to the south <br /> of the site is vacant agricultural land. Other land uses in the Area includ.0•fields of row craps and <br /> the Royster•Tire Storage and Recycling facility to the west. The Banta-Carbona Irrigation District <br /> canal runs along the western boundary of the site. Corral Hollow Creek Js also located north of <br /> the site: <br /> There are few residences in the project-area. The closest are the two mobile homes located <br /> across MacArthur Drive,approximately 600 feet northeast of the site. There-is also one residence <br /> approximately 1.4 miles South of the site on the west side of MacArthur Drive. There are also <br /> scattered residences at the intersection of Linne Road and MacArthur Drive,north of the site. <br /> The Final BR concluded that the project is not like to create land use conflicts with surrounding <br /> P ] iY g <br /> f fl' uses; either agricultural, residential, or resource extraction. The project will be enclosed with a <br /> six-foot high chain-link fence and landscaped along MacArthur Drive. Also,except for the wood <br /> - _• and yard waste processing and composting,all other operations will take place inside the transfer <br /> station building. This,.combined with the.project's locatlon in the bottom of the 30-toot-deep pit, <br /> t <br /> will.minimize land use conflicts. <br /> Property owners in the area were mailed notices of Draft EIR availability, as well as project <br /> referrals. No comments from neighbors were received on the Draft EiR., and no comments <br /> regarding the Draft EiR were made by the one neighboring property owner present at the hearing <br /> on the Draft EIR. <br /> Traffic/Circulation: <br /> The Final EIR prepared for the project did not identify any significant traffic related impacts. The <br /> proposed project is expected to generate approximately 500 daily trips initially and approximately <br /> 1,100 daily trips in 2010. Since the trips will likely be dispersed over an entire day, according to <br /> the FEiR there is We relative impact to other users of the local transportation system. <br /> FACiLiTIESJSERViCES: <br /> Drainage, <br /> Storm water runoff from all areas except the wood storage and yard.waste composting area will <br /> drain to an on-site retention pond. Storm water runoff from the wood storage.and yard waste <br /> I compost area will drain to an on-site lined evaporation pond. Water used for periodic wash dawn <br /> i of the transfer station floor will be collected and directed to holding tanks for temporary storage <br /> until pumped out and hauled off the site for disposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.