My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2023 RPT OF FACILITY INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS_2023 RPT OF FACILITY INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 11:59:22 AM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2023 RPT OF FACILITY INFO
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 22 <br /> professional biologist retained by the'appjicarit shell conduct a preconsfiuction survey for the <br /> burrowing owls If present, as specified In Chapter 4.2,Condition 4.2-6Lof the Final EIR. <br /> Monitoring Requirement: Review of survey results prior to construction. <br /> Personftency Responsible: San Joaquin County Community Development Department, <br /> Department of Fish and Game. <br /> Timing or Frequency of Monitoring: Within 60 days of construction. <br /> Geology,/Geotechnicai: <br /> Mitigation Measure: Seismic design shall be in accordance with the.Uniform Building Code <br /> (Seismic Zone 4), as specified in the project geotechnical repQrt.continued in Appendix F of the <br /> EIR. <br /> Monitoring Requirement: incorporate Into building plans submitted for plan check prior <br /> to building permit issuance.. <br /> PeiscQ g_ency Responsibie: San Joaquin Cbunty Building Inspection Division. <br /> Timingor r Frequency of Monitorinc�: :Prior to issuance of building permits. <br /> Mitigation Measure: All new.cuts and fills shall be consistent with the geotechnical <br /> recommendations contained in Appendix F of the EIR. In areas where slopes are steeper than <br /> 2:1 the following mitigation measure shall be implemented: regrade slopes to 2:1 ar flatter, or <br /> setback all improvements at least 30 feet from the top and bottom of slopes, or erect landslide <br /> debris barriers. <br /> Monitoring Requirement: Incorporate into grading plans submitted for plan check prior <br /> to grading permit issuance. <br /> Person/Agency Responsible: San Joaquin County Building Inspection Division. <br /> Timing or Frequency of Monitoring: Prior to issuance of grading permits. <br /> Mitigation Measure: Construction of fills, foundations, slabs and roadways on-site shall be in <br /> accordance with the geotechnical recommendations contained in Appendix F of the EIR. <br /> Monitoring Requirement: incorporate into building and grading plans submitted for pian <br /> ' check prior to giading permit isstiarice. <br /> i Person/Agency Responsible: San Joaquin County Building Inspection Division. <br /> Timing or Frequency of Monitoring: Prior to issuance of grading and/or building permits. <br /> 1 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.