Laserfiche WebLink
Transfer/Processing Report <br /> Tracy Materia/Recovery& Transfer Facility <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> PREFACE <br /> This Transfer/Processing Report (TPR) is the operations plan and permitting <br /> document of the existing Full Solid Waste Facilities Permit (SWFP)(SWIS No. 39- <br /> AA-0024) for the Tracy Material Recovery & Transfer Facility (MRF). A TPR is <br /> required by the California Code of Regulations (CCR), Title 14, Section 18221.6, to <br /> describe the operations of a facility in order to obtain a Full Solid Waste Facilities <br /> Permit (SWFP); it describes in detail the operations of the MRF and identifies <br /> operational changes requiring the revision of the SWFP. The purpose of the TPR is <br /> to identify design features and operation plans that mitigate or control potentially <br /> adverse environmental impacts while providing information demonstrating on how <br /> the Facility complies with state minimum standards. <br /> The operator, Tracy Material Recovery & Solid Waste Transfer, Inc. (Tracy) <br /> completed expansion of the existing permitted operations at the MRF in 2013, as <br /> allowed by the Solid Waste Facility Permit, by making the following operational <br /> changes that would be declared to be significant by the California Department of <br /> Resources, Recycling, and Recovery (CalRecycle): <br /> • Increase the tonnage to 1,800 TPD to meet the needs of AB 32 for City of <br /> Tracy and San Joaquin County <br /> • Expand programs to accommodate the AB 341 mandate of providing <br /> commercial recycling to all business and multi-family units <br /> • Expand the outdoor green waste processing operations to allow the <br /> processing of co-collected residential green waste with food waste, to <br /> produce compost feedstock and/or anaerobic digestion feedstock <br /> • Include the processing of commercial food waste inside a building to <br /> produce compost feedstock and/or anaerobic digestion feedstock <br /> • Add a 1 mega-watt wood waste biomass gasification plant <br /> • Increase the permitted hours of the facility for processing of materials in the <br /> MRF building to 24 hours daily, Monday— Sunday; <br /> The Solid Waste Facility Permit was not increased with respect to the permitted <br /> hours for receipt of waste at the facility for either the commercial operations (4:00 <br /> A.M. — 6:00 P.M. Monday — Saturday) or public (6:00 A.M. — 6:00 P.M. Monday — <br /> Saturday). <br /> iii <br />