My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021-2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
COMPLIANCE INFO_2021-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 1:39:40 PM
Creation date
10/3/2023 2:26:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021-2024
RECORD_ID
PR0440007
PE
4434 - LANDFILL DISPOSAL SITE - POST CLOSURE
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
Active, billable
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
14750 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closed Disposal Site Inspection Report ( 188 ) <br /> Harney Lane Sanitary Landfill ( 39 -AM003 ) <br /> 8/ 10/2023 <br /> Notes : <br /> 1 . The 2nd Quarter Landfill Gas Report received by the LEA on July 19 , 2023 . LFG results <br /> indicate the probes at monitoring wells measure less than 5 % methane by volume of air . <br /> 2 . Storm Water Remediation Plan received by the LEA in April 2023 . <br /> 3 . Flare was operating at the time of inspection . <br /> 4 . The gate near the flare station is closed . <br /> 5 . Operator should fill bait and check bait stations on a quarterly basis . <br /> 6 . Probes at monitoring wells #3 , #4 , and # 11 measured less than 5 % methane by volume <br /> of air . <br /> 7 . Observed stockpiled dirt onsite to the east of the flare station . Maintain site . Remove <br /> stockpiled dirt . <br /> 8 . Observed a small amount of litter along the interior fence line entrance . Remove litter . <br /> Windblown materials shall be controlled . <br /> 9 . Vegetation was at a minimum at time of inspection . <br /> 10 . Observed grading on west side of the primary site . <br /> Monitoring Well #3 : <br /> Shallow depth <br /> CH4 0 . 0 % <br /> CO2 2 . 7 % <br /> 02 18 . 3 % <br /> Intermediate depth <br /> CH4 0 . 0 % <br /> CO2 6 . 7 % <br /> 02 13 . 4 % <br /> Deep depth <br /> CH4 061 % <br /> CO2 6 . 4 % <br /> 02 0x1 % <br /> CalRecycle Solid Waste Information System ( SWIS ) Page 2 of 4 <br /> M _ 1 _ P� _ ._ _ ._ _ 1 _ _1 . A _ . _. . . _ 1 AA r\ /lAr1 rl . nA MRA <br />
The URL can be used to link to this page
Your browser does not support the video tag.