My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18095
>
2300 - Underground Storage Tank Program
>
PR0548699
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 9:08:02 AM
Creation date
10/3/2023 5:01:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548699
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027873
FACILITY_NAME
ARCO AMPM-MOUNTAIN HOUSE
STREET_NUMBER
18095
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
18095 W GRANT LINE RD MOUNTAIN HOUSE 95391
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N�J O A Q U IN RECEIVED Environmental Health Department <br /> COUNTY <br /> MAY 2 4 2023 <br /> F. SYSTEM PIPING CONTINUEMANTH pE ARTM L <br /> ENT <br /> Check Code <br /> Box Section <br /> L>� HS90.1 c 1 Piping compatible with material intended to be stored. <br /> 25290.2 c 1 <br /> —/ 23 CCR <br /> eC 2631(b) Design and construction of piping approved by independent testing organization (e.g. UL). <br /> Piping, including vent lines, sloped toward tank(s) with minimum 1/8 inch slope per 1 foot of run. <br /> 25290.1 k Vapor recovery, fill riser, and vent line piping are secondarily contained. <br /> 25290.2Ec3&(j) <br /> G. OVERSPILL/ OVERFILL PREVENTION: <br /> Check Code <br /> Box Section <br /> 23 CC Overspill containment havi minimum capacity of 5 gallons provided at each tank fill location. <br /> Manufacturer Q PZ�1_ <br /> Model 3 <br /> Approved overfill prevention device provided at each tank fill location. <br /> Choose One of the following methods: <br /> ❑ Alert the transfer operator when the tank is 90 percent full by restricting the flow into the tank or <br /> triggering an audible visual alarm <br /> ❑ Restrict delivery of flow to the tank at least 30 minutes before the tank overfills, provided the <br /> 23 CCR restriction occurs when the tank is filled to no more than 95 percent capacity; and activate an <br /> 2635(b)(2) audible alarm at least five minutes before the tank overfills <br /> Provide positive shut-off flow to the tank when the tank is filled to no more than 95 percent of <br /> capacity. <br /> ❑ Provide positive shut-off of flow to the tank so that none of the fittings located on the top of the <br /> tank are exposed to product due to overfilling. <br /> Manufacturer QPUI Model <br /> H. CORROSION PROTECTION: <br /> Check Code <br /> Box Section <br /> LI/Pilberglass reinforced plastic (FRP) <br /> Piping corrosion protection: ❑ Steel with cathodic protection or impressed current <br /> 23 CCR <br /> bj ❑ Steel isolated from contact with backfill <br /> ❑ FRP or equivalent non-metallic exterior coatings or coverings <br /> Tank corrosion protection: El Sacrificial Anode <br /> 26CCR <br /> (a)(2) G✓Steel tank with field installed cathodic protection or impressed <br /> / current <br /> Tie-downs, when used, constructed of non-corrosive material or coated steel. <br /> 7of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.