Laserfiche WebLink
RECEIVED <br /> MAR 2 7 "073 <br /> B500 Series <br /> 0�) <br /> BRAVO ENVIRONMENTAL PROBLEM SOLVED HEALTH DEPARTMENTSig <br /> n lewa I I and Doublewall <br /> SIZES U <br /> o <br /> • Small25.5" <br /> • Large 41.5" LISTED <br /> UL 2447 <br /> *See page 2 for dimension drawing and dimension chart <br /> MATERIAL <br /> • Fiberglass <br /> • Epoxy coated galvannealed steel <br /> SPECIFICATIONS <br /> Product Shown 6 quality FRP construction, no need for gelcoat <br /> 13SQ1-S <br /> for chemical resistance <br /> About the B500 Series "Planter"style raised lid to keep surface water <br /> out <br /> Bravo's B500 Series Singlewall and Doublewall <br /> transition sumps are compatible with all common �► Accommodates up to 5 factory installed AST <br /> motor fuels and can be ordered with standard AST fittings depending on model <br /> fittings pre-installed.The fittings range from <br /> electrical offset(EO) to 3" compression pass-through 10 Factory mounting points make a rack system <br /> AST fittings.This series comes standard with positive installation simple <br /> concrete anchoring and mounting points for optional <br /> rack system. <br /> • 30-year corrosion warranty <br /> • UL2447listed <br /> • Doublewall construction can be monitored with <br /> Bravo Solution Center vacuum or hydrostatically making it triennial <br /> Cell or Text(32 )541-3851 <br /> testing exempt with continuous monitoring <br /> orders sbravo,com i Ships under a continuous 20" Hg vacuum test <br /> • • • • • • • . • / e �• <br /> • • • .61 :. <br />