My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18095
>
2300 - Underground Storage Tank Program
>
PR0548699
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 9:08:02 AM
Creation date
10/3/2023 5:01:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548699
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027873
FACILITY_NAME
ARCO AMPM-MOUNTAIN HOUSE
STREET_NUMBER
18095
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
18095 W GRANT LINE RD MOUNTAIN HOUSE 95391
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> MAR 2 7 "073 <br /> B500 Series <br /> 0�) <br /> BRAVO ENVIRONMENTAL PROBLEM SOLVED HEALTH DEPARTMENTSig <br /> n lewa I I and Doublewall <br /> SIZES U <br /> o <br /> • Small25.5" <br /> • Large 41.5" LISTED <br /> UL 2447 <br /> *See page 2 for dimension drawing and dimension chart <br /> MATERIAL <br /> • Fiberglass <br /> • Epoxy coated galvannealed steel <br /> SPECIFICATIONS <br /> Product Shown 6 quality FRP construction, no need for gelcoat <br /> 13SQ1-S <br /> for chemical resistance <br /> About the B500 Series "Planter"style raised lid to keep surface water <br /> out <br /> Bravo's B500 Series Singlewall and Doublewall <br /> transition sumps are compatible with all common �► Accommodates up to 5 factory installed AST <br /> motor fuels and can be ordered with standard AST fittings depending on model <br /> fittings pre-installed.The fittings range from <br /> electrical offset(EO) to 3" compression pass-through 10 Factory mounting points make a rack system <br /> AST fittings.This series comes standard with positive installation simple <br /> concrete anchoring and mounting points for optional <br /> rack system. <br /> • 30-year corrosion warranty <br /> • UL2447listed <br /> • Doublewall construction can be monitored with <br /> Bravo Solution Center vacuum or hydrostatically making it triennial <br /> Cell or Text(32 )541-3851 <br /> testing exempt with continuous monitoring <br /> orders sbravo,com i Ships under a continuous 20" Hg vacuum test <br /> • • • • • • • . • / e �• <br /> • • • .61 :. <br />
The URL can be used to link to this page
Your browser does not support the video tag.