My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2226
>
2300 - Underground Storage Tank Program
>
PR0548528
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 1:01:27 PM
Creation date
10/4/2023 12:59:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0548528
PE
2351
FACILITY_ID
FA0000370
FACILITY_NAME
ORLANDOS ESCALON
STREET_NUMBER
2226
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22727016
CURRENT_STATUS
01
SITE_LOCATION
2226 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Program Element: 2303 - UST/PIPING INSTALLATION <br />Telephone: (916) 708-4999 Requestor: SAMMY ORLANDO, BIG BOY CHEVRON <br />Inspection Type: 298 - UST SERVICE REQUEST - FIELD ACTIVITY <br />Address: 2226 JACKSON AVE , ESCALON 95320 <br />Date: 09/01/2023Name of Facility: BIG BOY MARKETS INC <br />Underground Storage Tank Program Service Request Inspection Report <br />Request #: SR0085530 <br />Environmental Health Department <br />Onsite Service Technician: John Puumala ICC Service Tech/Installer Exp. Date: 02/01/2024 <br />Manufacturer training: VR, 07/07/24; VMI, 12/04/24 <br />OVERALL INSPECTION NOTES AND COMMENTS <br />NOTES <br />On site for prior to final inspection. <br />- Verified vacuum zone programming and monitored volume <br />- Witnessed leak detector testing <br />- Witnessed Monitoring System functionality <br />- Verified the "UST Certification of Installation/Modification" element was submitted onto CERS <br />- Verified as-built drawing was accurate <br />- Received Xerxes installation checklist <br />- Verified DO training for Employees are on site <br />This facility is approved to received fuel. <br />This facility is NOT approved to operate. <br />**************Annual Monitor System Certification is set to the month of August ************** <br />**Note the following documentation are needed: <br />- Provide computability for the renewable biodiesel 20 <br />- Fees must be paid <br />- ELD testing must be sent in <br />The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br />Safety Code. If a reinspection is required, fees will be assessed at the current hourly rate. <br />Received by: Name and Title: <br />EH Specialist:Phone:(209) 616-3045 <br />Emailed to Sammy Orlando, Owner <br />KRISTINA SAETERN <br />Page 1 of 1EHD 23-01 Rev. 07/05/2022 Underground Storage Tank Program Service Request Inspection Report <br />FA0000370 SR0085530 SC298 09/01/2023
The URL can be used to link to this page
Your browser does not support the video tag.