Laserfiche WebLink
Part 3. FACILITY INFORMATION <br /> A.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL EXISTING FACILITIES: 2. PROPOSED CHANGE(S)OR INFORMATION APPLICABLE TO NEW SWFP <br /> AND/OR WDRs <br /> a. MAXIMUM DAILY TONNAGE a. MAXIMUM DAILY TONNAGE <br /> OR CUBIC YARDS 1,800 tons/da TPD OR CUBIC YARDS n/a <br /> b. AS-DESIGNED DAILY TONNAGE 1,800 TPD b. AS-DESIGNED DAILY TONNAGE n/a <br /> or CUBIC YARDS or CUBIC YARDS <br /> c. FACILITY SIZE(acres) 51.7 acres c. FACILITY SIZE(acres) n/a <br /> d. MAXIMUM TRAFFIC VOLUME PER DAY 1,245 vehicles per day d. MAXIMUM TRAFFIC VOLUME PER DAY n/a <br /> (vpd) (vpd) <br /> e. DAYS AND HOURS OF OPERATION Receipt of Materials:Commercial, e. DAYS AND HOURS OF OPERATION n/a <br /> 4 AM to 6 PM/Mondav-Sunday;Self-haul,6 AM to 6 PM/Monday-Sunday <br /> Processing hours:Indoors-24 hours/Monday-Sunday,Outdoors-6 AM <br /> to 10 PM/Monday-Sunday.Maintenance hours:24 hours/Monday-Sunday <br /> f. OTHER Amend Report of Facility Information to include SB 1383 <br /> facility requirements,amended site plans,and update <br /> minor changes to operations descriptions. <br /> 3.ADDITIONAL INFO.REQUIRED FOR COMPOSTABLE MATERIALS HANDLING FACILITIES ONLY: <br /> a. TOTAL SITE CAPACITY(cu yds) 68,700 cubic yards <br /> 4.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a. AVERAGE DAILY TONNAGE(TPD) n/a <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) n/a <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds) n/a <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds) n/a <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds) n/a <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions): n/a <br /> g. LAST PHYSICAL SITE SURVEY(Date) n/a <br /> h. ESTIMATED CLOSURE DATE(month and year) n/a <br /> i. DISPOSAL FOOTPRINT(acres) n/a <br /> j. SITE CAPACITY PLANNED(cu yds) n/a <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste) n/a <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v) n/a <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) n/a <br /> Part 4. SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> 1-1 A. MUNICIPAL OR UTILITY SERVICE: n/a <br /> X❑ B.INDIVIDUAL(wells): All water for facility operations,including potable water will be obtained from an on site supply well <br /> C.SURFACE SUPPLY: n/a <br /> 1.NAME OF STREAM,LAKE,ETC.: <br /> 2.TYPE OF WATER RIGHTS: <br /> ElRIPARIAN F] APPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE: <br /> D.OTHER: n/a <br /> Page 2 <br />