Laserfiche WebLink
Disposal Facility (Site) Inspection Report (52) <br /> North County Landfill & Recycling Center (39-AA-0022) <br /> 6/23/2023 <br /> 4. Pathogen Reduction / Maximum Metals Concentrations / Physical Contamination Limits <br /> testing was last done May 20, 2022 on the chipped and ground wood waste that will be land <br /> applied. Testing is required every 5,000 cubic yards and once a year. Sampling for testing is <br /> due by May 20, 2023. Title 14 CCR sections 17868.1 to 17868.5. Provide sample results to <br /> the EHD, when available. <br /> 5. Soil gas monitoring well #3 was measured. Deep probe: 0.0% methane, 0.1% carbon <br /> dioxide, 20.5% oxygen; intermediate probe: 0.0% methane, 0.3% carbon dioxide, 20.3% <br /> oxygen; shallow probe: 0.0% methane, 1.4% carbon dioxide, 17.8% oxygen. <br /> 6. Soil gas monitoring well #2 was measured. Deep probe: 0.0% methane, 0.0% carbon <br /> dioxide, 20.3% oxygen; intermediate probe: 0.0% methane, 0.1% carbon dioxide, 20.3% <br /> oxygen; shallow probe: 0.0% methane, 4.0% carbon dioxide, 17.1% oxygen. <br /> 7. Daily tonnage violation from the previous inspection is cleared. No daily tonnage or trip <br /> permit limit exceedances in May. <br /> 8. Reviewed special occurances log, training record and load check record. <br /> 9. No violations or areas of concern. <br /> Attachments <br /> inspection photos <br /> CalRecycle Solid Waste Information System (SWIS) Page 2 of 2 <br /> Date Generated: June 28, 2023 1:48 PM <br />