My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ATHERTON
>
1222
>
2300 - Underground Storage Tank Program
>
PR0547926
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 11:14:16 AM
Creation date
10/10/2023 11:40:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0547926
PE
2351
FACILITY_ID
FA0027325
FACILITY_NAME
CHEVRON #385102
STREET_NUMBER
1222
Direction
W
STREET_NAME
ATHERTON
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22616041
CURRENT_STATUS
01
SITE_LOCATION
1222 W ATHERTON DR
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE PROCEDURE ONLY,FOR STANDARD MOD- STEP 3T: DETERMINE CABLE LENGTH <br /> ELS, PROCEED TO NEXT PAGE. Run cable along upper tube and over the top plate on <br /> the float bracket as shown. With the float in the down <br /> STEP 1T: INSTALL SOCKET ADAPTOR ASSY position (as shown in Figure 3T) align loop in cable with <br /> Put cable thru threads in inlet tube and out thru cable rivet and top hole in float bracket. Use the rivet as a <br /> port on side of inlet tube. Thread the socket adaptor template to size the loop in the cable and pull cable <br /> assembly finger tight into the inlet tube. Note: the ca- tight and crimp ferrule with crimping tool/pliers onto <br /> ble port on the inlet tube must be in line with the float cable at this location. Trim excess cable with wire cut- <br /> as shown previously in Figure 8A. ter/scissors. For reference,from the seam where the <br /> upper tube and valve body meet to the end of the cable <br /> Socket after trimming will require approximately 3.5"of cable. <br /> adaptor <br /> assembly Cable over float bracket <br /> ookCable Seam <br /> port <br /> i Figure 3T <br /> STEP 4T: ATTACH CABLE TO FLOAT BRACKET <br /> Figure IT Ensure cable is over the float bracket. Using the sup- <br /> plied rivet align loop in cable with top hole in float <br /> STEP 2T: PASS CABLE THRU FERRULE bracket and pass rivet thru cable loop and float bracket <br /> Pass cable thru ferrule. Loop cable and then pass cable hole. Using rivet tool for 1/8"dia mandrel attach rivet <br /> back thru ferrule. Keep ferrule loose until cable length and cable to the float bracket. See last page for list of <br /> is determined in the next step. Note: if cable end frays replacement cable parts. <br /> it may be necessary to trim the cable again to pass thru <br /> ferrule. Attach rivet to top hole <br /> 1/8"mandrel <br /> z <br /> rivet <br /> Ferrule <br /> Figure 4T <br /> Trim STEP 5T:ENSURE PROPER CABLE OPERATION <br /> cable Unthread the socket adaptor assembly from the inlet <br /> after tube and ensure float and poppet move freely when <br /> step 3T Loop socket adaptor assembly is pulled on. It should only <br /> require 3"to 4"of movement in order to actuate the <br /> Figure 2T float and poppet. Thread socket adaptor assembly fin- <br /> ger tight into inlet tube after testing. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.