My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ATHERTON
>
1222
>
2300 - Underground Storage Tank Program
>
PR0547926
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 11:14:16 AM
Creation date
10/10/2023 11:40:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0547926
PE
2351
FACILITY_ID
FA0027325
FACILITY_NAME
CHEVRON #385102
STREET_NUMBER
1222
Direction
W
STREET_NAME
ATHERTON
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22616041
CURRENT_STATUS
01
SITE_LOCATION
1222 W ATHERTON DR
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery <br /> Fill Riser <br /> is r <br /> OPW <br /> Ball Float <br /> 14" Minimum <br /> Clearance for ~~� <br /> Tube Cut <br /> per Loca I Float <br /> _ 4" NPT � <br /> Requirements Nipple <br /> } <br /> 1 � <br /> 6" <br /> Align Float Along Length of Tank Swivel <br /> Figure 24 Product <br /> � 0 Jack <br /> Adaptor Screw <br /> Kit <br /> Orient socket <br /> adaptor be- FOR TESTABLE MODELS ONLY: Check installation <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screw bolts resets properly. See page 17 for full testing details. Ap- <br /> ply pipe dope to the socket adaptor threads. Pipe dope <br /> should be a non-hardening gasoline resistant pipe <br /> thread seal compound. Install socket adaptor and <br /> O torque to 3.5 ft-lbs (42 in-lbs) minimum to 5.0 ft-lbs(60 <br /> in-lbs) maximum. After installing socket adaptor where <br /> required,pressure test testable overfill valve per CARB <br /> TP201.1 D to ensure valve is vapor tight. <br /> O <br /> Figure 24A <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.