Laserfiche WebLink
The potable water access port on top of the tank shall be flanged upward at least% inch, <br />and with a port cover assembly including a gasket. (114221(a)) <br />The entrance door must be self closing. (114303) <br />Provide a second exit, opposite the main exit door, or roof, or rear, with at least 24" x 36" <br />of unobstructed passage. The exit shall be labeled "Safety Exit" in letters at least 1 inch <br />high. (114323 (f)) <br />The handwash sink shall be separated from the warewash sink by a metal splashguard <br />at least 6" from back edge of the drainboard to the front edge, unless they are separated <br />by 24" or more. (114311(b)) <br />No exposed threads, nuts, or rivets that interfere with proper cleaning. (114301(g)) <br />The exhaust hood must be constructed to meet the requirements of the California <br />Mechanical Code. (114149.1) <br />\/11.0btain a State Mobile Food Preparation Unit "Insignia" if necessary. Contact State <br />Housing and Community Development for approval of your commercial coach at (916) 255- <br />2501. <br />12 pbtain a verification of commissary. <br />The EHD must be kept informed of the construction progress. A final inspection must be <br />performed, operating permit fees paid, and approval to operate granted prior to opening for <br />business. All equipment must be installed and thorough cleaning completed prior to the final <br />inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br />inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of $162 <br />per hour. <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br />applicable State laws, and/or city or county ordinance codes, shall be constructed or <br />reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not be <br />accepted for the construction or operation of a food facility. Any variance from the requirements <br />outlined in this letter will require written approval from the EHD. Approval of the submitted plans <br />shall become null and void if the work authorized is not commenced within 180 days from the date <br />of approval, or the work authorized by such plans is abandoned. In order to renew action on an <br />expired plan approval, the applicant shall submit fees equal to that of a new plan review. A copy <br />of the approved plans shall be available on site at the time of final inspection. <br />If you have any questions, please contact Kadeanne Linhares, Senior Registered Environmental <br />Health Specialist, at (209) 616-3025.