Laserfiche WebLink
t 1ndergrni ind Storage Tank <br /> t-cE ill 1"I ever'k rl EQUiprucint Inspection Report Form <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (One OPEpercolumn) 87JEO <br /> 91 __ __ <br /> Are both vent and tank riser piping ❑ Yes Yes ❑ Yes -] Yes <br /> secondarily contained? ® No No ❑ No ❑ No <br /> OPE Model EMCOMCOTank Manufacturer Cont Soluont Solut <br /> ® Shuts off Z Shuts off ❑ Shuts off ❑ Shuts off <br /> Flow Flow Flow Flow <br /> What is the OPE response when ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> activated? Flow Flow Flow Flow <br /> Check a!!that apply.) ❑ Audible ❑ Audible ❑ Audible ; ❑Ala Alarm( Alarm Alarm Alarm <br /> ❑Visual ❑Visual ' ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent r-1Yes E] Yes ❑ Yes ❑ Yes <br /> piping that may interfere with the OPE ® <br /> No ❑ No r-1No ❑ No <br /> j operation? <br /> At what level in the tank is the OPE set to 105" 145" <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank in 94% 94% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition ® Yes Yes ❑ Yes ❑ Yes <br /> to respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> j reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> j OPE Inspection Results ® Pass ® Pass El Pass El Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Installed new drop tubes, built to correct specs. <br /> fk <br /> 1 <br />