Laserfiche WebLink
Sch ed h 9A4) cvmm+• . <br /> :.;04:00a-12:00P <br /> T <br /> 00-CASHIERING COMMON DESK. <br /> d = A available <br /> .t. 01 C <br /> AnaYa,Miranda <br /> --y -- -- -- --- J— -- -- Marie <br /> Table 3-1. Summary of Facility Inspection Schedule <br /> ITEMS TO BE INSPECTED FREQUENCY <br /> All fuel pumps and dispensers for condition and leaks MONTHLY <br /> Fuel dispenser nozzles functioning properly DAILY/WEEKLY/MONTHLY <br /> Availability of Spill Kit with wipe rags and absorbent MONTHLY <br /> material <br /> Environmental control ponds, drainage areas, trench QUARTERLY <br /> drains and catch basins for proper flow <br /> Condition of fuel unloading piping, fill ports MONTHLY <br /> Condition of oil/water separator discharge chamber QUARTERLY <br /> Integrity of fuel spill containment areas MONTHLY <br /> Oil/water separator - separation chamber QUARTERLY <br /> Bulk storage tanks and auxiliary piping MONTHLY <br /> Oil/Water Separator Inspection and Recordkeepin <br /> Frequent inspections of the oil/water separator discharge chamber are required, and all <br /> chambers of the separator will be inspected. Inspections will verify that there is no fuel or <br /> oil in the discharge chamber by utilizing a polyethylene bailer. If at any time fuel or oil is <br /> detected in the discharge chamber then the entire oil/water separator will be inspected and <br /> lecessary arrangements will be made to remedy the situation. The comprehensive <br /> nspection will utilize a graduated measuring stick and water finding paste to measure the <br />-,vels of sediment (grit), water, and oil in all chambers of the separator including cif <br /> pplicable) the detached grit box. Oil/water separator stick readings will be entered by <br />,,ore personnel into an online database using a password protected web site. Grit chamber <br />,paration chamber, and oil chamber readings will be entered as indicated by the on <br />