My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2800 - Aboveground Petroleum Storage Program
>
PR0542166
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:10:47 PM
Creation date
11/16/2023 8:22:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0542166
PE
2832
FACILITY_ID
FA0023459
FACILITY_NAME
Pilot Travel Center Lathrop - 1017
STREET_NUMBER
345
STREET_NAME
ROTH
STREET_TYPE
Rd
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
345 Roth Rd
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(:EDJONES COVEY GROUP, INC. <br /> (-UMFLL I L rULL JYJ I I M I,UNV ) I KUU I IUN rt MAIN I LNANCE SERVICES <br /> 9595 Lucas Ranch Rd. - Rancho Cucamonga - California 91730 <br /> Pilot Travel Centers Pilot 1017 Lathrop <br /> PO Box 10146 345 Roth Rd. <br /> Knoxville, TN 37939-0146 Lathrop, CA 95330 <br /> -11M lll� <br /> Invoice Number Invoice Date Due Date 130 Number Assigned Tech <br /> 2249246-1 05/16/22 06/30/22 160053445 James W. Blaine <br /> Service Items: <br /> Job Details Tank 9 has small leak on check valve area. <br /> Completion Notes: <br /> 04/19/22-Arrived on site,checked in with site&kiosk. Performed inspection of DT9 Leak. Found carbon build up around <br /> check valve area but no leaks from turbine check valve. Looks to be spraying at one time from other piping location.Will <br /> need to remove 3"piping from Union to Union. Will need to use piping vice and re-pipe union to union including Fire <br /> Valve, Solenoid Valve,One way check valve& re-install on tank top.Also need to remove and re-install pressure relief <br /> valve. Once re-piped no leaks should be present.Checked out with site at kiosk. <br /> 5/4/2022-Arrived on site and checked in with manager,cleaned up 3"check valve on T9 and found leaks on ring gasket <br /> and 2 on 3"pipe nipples. LOTO T9, emptied the manifold, removed the 3"check valve and when I removed the top of the <br /> valve and found that the ring gasket was broken. Installed new fuel compatible ring gasket on valve, removed the 2-3" <br /> black nipples and resealed, installed check valve on T9 manifold,tested the 3"check valve and no leaks were found. Put <br /> STP 9 back in service and cleaned up work area. <br /> Unit Pr' <br /> Labor 16 $82.00 $1312.00 <br /> Travel 10 $80.00 $800.00 <br /> Fuel Surcharge 10 $18.00 $180.00 <br /> Equipment Rental 1 $1080.00 $1080.00 <br /> Mileage Charge 736 $0.60 $441.60 <br /> Per Diem 2 $70.00 $140.00 <br /> Lodging 2 $170.00 $340.00 <br /> Consumables 1 $100.00 $100.00 <br /> Parts 1 $150.00 $150.00 <br /> Previous Work Performed 1 $329.90 $329.90 <br /> Subtotal V $4873.50 <br /> L�aleax $0.00 <br /> ue $4873.50 <br /> BUILDING BUSINESS PARTNERSHIPS <br />
The URL can be used to link to this page
Your browser does not support the video tag.