My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
4343
>
2300 - Underground Storage Tank Program
>
PR0548708
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 11:48:33 AM
Creation date
11/21/2023 2:43:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548708
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027878
FACILITY_NAME
IGRA INVESTMENTS INC
STREET_NUMBER
4343
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95391
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
4343 WILSON WAY STOCKTON 95391
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMP SENSOR, INSTALL AT 53 110 ELECT PENETRATION BOOT SUMP SHIELD Q SINGLEPORT MANHOLE W/ <br /> OLOWEST POINT TO ENSURE BRINE INTERSTITIAL SENSOR 51 88 LIQUID TIGHT$VAPOR TIGHT FILL <br /> 51C LIQUID DETECTION AT EARLIEST 42`0 DOUBLE WALL F.R.P. BOX,5 GAL SPILL BUCKET,WITH <br /> POSSIBLE MOME <br /> 3 75 CONTAINMENT SUMP WITH Q O DRAIN <br /> REDUCING LID o o a 7 <br /> IPI51 BRINE INTERSTITIAL SENSOR — 3 — <br /> 0 0 � <br /> 6 88 SINGLE PORT MANHOLE Q <br /> 9 FILL PORT _ \ <br /> FI L JUNCTION BOX / 8 30 4"TOP SEAL ADAPTOR GAP <br /> — <br /> O I 3"OV2"F.R.P.VENT LINE TO VENT SUMP PENETRATION BOOT / O <br /> / \ SUMP Jo 0 <br /> I 7 83 FUEL SWIVEL ADAPTOR <br /> DEF VENT CAP � 1" ONDUIT FROM ANNULAR I I <br /> 132 1 AGE MONITOR JUNCTION BOX 1" MIN.GLR TO SUMP <br /> � SUMP PENETRATION BOOT 112 9 <br /> 1" ON U D IT TO TURBINE i, 2" IN 3"CROSS OVER CONDUIT <br /> 2" BELLxMALE F.R.P. MP JUNCTION BOX — — — I I PRESSURE LINE TO TURBINE <br /> DIESEL VENT CAP THREADED ADAPTOR — — — I I SUMP, PRIMARY LINE OPEN FOR <br /> 20 I I ELECT OR MONITOR WIRES. K12 Architects Inc <br /> 3"OVER 2"F.R.P.VENT LINE I I � <br /> 2"x18"FLEJCIBLE CONNECTOR T 3 75 42"DOUBLE WALL 3090 Fite Circle, #104 <br /> 44 113 MALE SWIVEL FEMALE — — Sacramento, <br /> 3"SQUARE w o 3"OVER 2'FOR 3 TEST PORT WITH HOSE CONTAINMENT SUMP - CA 95827 - <br /> TUBE FRAME w MONITORING AND 16 36 �' T FI IN CONNECTION GAP I PH:(916)455 6500 FAX:(916)455 8100 <br /> w ELECT$VACUUM. WITH TOP PLUG I <br /> TO TURBIN SUMP. 2"BELLxMALE F.R.P. CONSULTANTS: <br /> O a THREADED ADAPTOR FIBERGLASS ONTAINMENT SUMP TO <br /> DIESEL FILL - PLAN VIEW EXTRACTOR FITTING TANK COLLA INSIDE AND OUT TO <br /> WITH STL PLUG AT TOP INSURE WA R TIGHTNESS <br /> 9 I I I <br /> 2"F.G. PIPE SCALE: 3/4" = V-0.. I I <br /> LIQUID SENSOR INSTALL AT I I <br /> VENT SUMP 40 <br /> CONTRACTOR TO LOWEST POINT TO ENSURE <br /> 51C I <br /> z PROVIDE RIGID PIPE TO LIQUID DETECTION AT EARLIEST <br /> EA.VENT RECOVERY POSSIBLE MOMENTSUMP I I <br /> SENSOR INTERSTITIAL MANIFOLD I i 4"ALUMINUM FILL TUBE w/ <br /> /' I X IPOSITIVE SHUT OFF DEVICE: <br /> 5 3 <br /> 15 INSTALL AT 93%OF TANK CONTRACTOR: <br /> 1"ELECT CONDUIT SEAL ALL OPENINGS I CAPACITY <br /> VE T LINE SUMP SLOPE WATER TIGHT I I Q <br /> a\ 140 - I <br /> SUMP SENSOR <br /> II <br /> KWIK FIT ELEC, <br /> 142 <br /> 00 i 2"X 24"DEF FL 8 SUMP LIQUID SENSORS: IF THESE ARE MOUNTED IN A SLEEVE OR TUBES,THAT ARE TANK LEVEL MONITOR 47 <br /> I I <br /> _z I TO BE CONSTRUCTED AND INSTALLED SO THAT THE SENSOR WILL HAVE THE I I NOTES: <br /> 2"X 18"FLEX 143 ABILITY TO DETECT A LEAK AT THE EARLIEST OPPORTUNITY.THE SLEEVE OR TUBE AT SUMP PENETRATION MAXIMUM ALLOWABLE PENETRATION ANGLE. <br /> 45 BLACK <br /> o SHALL NOT BE TIGHT AGAINST THE BOTTOM. GUT END AT AN ANGLE OR WITH 1 <br /> _ _ — — I I 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS PREFERRED. <br /> % — IRON ELBOW 5° <br /> I PENETRATIO 8 TS NOTCHES SO LIQUID IS ABLE TO GET TO THE SENSOR IMMEDIATELY. Q i i I I <br /> v <br /> roll FOR DEPTH SEE 2"x 18" FLEX O 7 I 2. USE SUMP PENETRATION BOOTS AT ALL PENETRATIONS OF SUMP. PROJECT: <br /> RACK SYSTEM FOR CONNECTOR <br /> ° 1-3-PRODUCT PIPING NOTES ON I <br /> FS2.1 O A S P 51G I I 3• ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 1'-0"OF THE TOP OF <br /> 12"SQUARE 141 SENSOR SEE DETAILOI I SUMP. �`�1 4 <br /> (TYP OF 2) PAINT ALL 18/F55.0 I 4. USE OPW RISER SUPPORT BRACKETS(BRACELETS) <br /> EXPOSED NOTE: <br /> BRAVO TEST PORT WITH <br /> V <br /> NOTE: PIPING THE DISPENSER SUMPS AND VENT SUMPS HAVE PROPYLENE GLYCOL IN THE CONNECTION HOSE$CA <br /> 30" MIN,ABOVE ROOF OF ANY _ NOTE: <br /> STRUCTURE WITHIN 10' INTERSTITIAL SPACE PENETRATION FITTING E TANK AND THE TANK SUMPS HAVE CALCIUM CHLORIDE IN THE <br /> INTERSTITIAL SPACE. <br /> CONTRACTOR TO LABEL FILL PORTS WITH 3"OVER 2"DOUBLE <br /> TYPE OF FILL. WALL VENT PIPE DEFLECTOR PLATE CONTRACTOR TO LABEL FILL PORTS WITH TYPE OF FILL. <br /> 18 TRUCK FUEL VENT STACK 14 SUMP SENSOR NOTE 1 VENT SUMP SECTION 6 DIESEL, FILL, AND VENT DETAIL CONVENIENCE STORE & <br /> SCALE: N.T.S. SCALE: N.T.S. FOR NEW INSTALLATIONS SCALE: 3/4" = V-0'• SCALE: 3/4" = V-0" FUELING CANOPY <br /> a1"� ONDUIT TO INTRINSICALLY SAFE 1" ONDUIT FOR PUMP POWER TO <br /> GUTTER AT MONITOR CONTROL 3 LECT. PANEL-1 PER TANK <br /> PANEL(1 PER TANK) <br /> Q <br /> CONDUIT TO TLM North Wilson Way <br /> BRINE INTERSTITIAL SENSOR 51 <br /> Stockton, California 95205 <br /> 2-PIN CONNECTOR OF CABLE. EXPLOSION PROOF JUNCTION BOX <br /> ATTACHES TO GCVP VALVE TURBINE PUMP Be <br /> VALVE ENCLOSURE ASSEMBLY - \ <br /> WATERTIGHT MANHOLE 102 30 <br /> SUMP SENSOR, INSTALL AT 3 D <br /> CANISTER OUTLET MUST BE 12'-0" MIN. / LEAK DETECTOR 51B <br /> ABOVE GRADE. O LOWEST POINT TO ENSURE Q DEVELOPER: <br /> PRESSURE VACUUM SEE 20/FS5.0 FOR GAS TANK 51C LIQUID DETECTION AT EARLIEST � <br /> VENT VALVE BEYOND MANIFOLD THE 31 GAS TO THE FOR UNLEADED GAS POSSIBLE MOMENT <br /> M VENT VALVE 87 GAS, SEE 20/FS5.0 I G U RPARTAP SING H <br /> 19 UNLEADED SENSOR HOUSING USE SIPHON JET PORT FOR \ IGRA INVESTMENTS <br /> VACUUM GENERATION <br /> DOUBLE WALL62 N. SIERRA MADRE ST. <br /> 20 DIESEL `_- _I CHECK VALVE FOR �� CONTAINMENT SUMP 76 4 A MOUNTAIN HOUSE, CA 9 391 <br /> LEAK DETECTOR I <br /> DIESEL VENT GAP <br /> 2x24" FLEXIBLE CONNECTOR VACUUM SENSOR AND HOSE <br /> CANISTER ASSEMBLY 52 9 <br /> PIPE MANIFOLD O 31 103 45 MALEFEMALE SWIVEL REVISIONS: <br /> 2"BALL VALVE(MAKE HANDLE <br /> I 2"BCH.40 FRP, BELL x FEMALE ACCESSIBLE FROM GRADE) 104 32 1 OWNER CHANGES 03/01/2022 <br /> "SQUARE � THREADED ADAPTER <br /> PLAN CHECK 05/12/2022 <br /> CANISTER SUPPORT 43 ----�Y--r TUBE FRAME w 3"OVER 2"PRODUCT, Q BUILDING DEPT REVISIONS 08/08/2022 <br /> BRACKET AND FASTENERS. _ <br /> II 0 <br /> c I I 3"x2"BOOT WITH TEST PORT TO DISPENSERS <br /> Ul INI <br /> 5 OWNER CHANGES 10/04/2018 <br /> -- <br /> 2"THREADED VENT PIPE ;ll); 2"THREADED VENT PIPE BEYOND 0 <br /> �IINS DIESEL TURBINE SUMP PLAN VIEW FUEL COMMENTS 2/5/23 <br /> I 7 7 FUEL COMMENTS 4/20/23 <br /> CORD GRIP 2"F.G. PIPE <br /> SCALE: 3/4" = V-0" <br /> $ FUEL COMMENTS 5/15/23 <br /> O J BOX, EPDXY ENGLOBED ' ' PROFESSIONAL SEALS: <br /> I I ? WATERTIGHT SHROUD LID O 7C 30 102 ATERTIGHT MANHOLE Q <br /> CONNECTIONS I I //, I 3 <br /> 18 : a Q 51 MONITORING <br /> BRINE SUMP INTERSTITIAL <br /> INLET PIPING KIT / j/ I a a ° a 23 33 TURBINE PUMP14 <br /> ti <br /> T LINE 5UMP29 <br /> / / 4O JUNCTION BOX • <br /> 2"x 1/2" NPT REDUCING TEE / // / z DOUBLE WALL CONTAINMENT � NOV oza <br /> \��i <br /> SUMP SENSOR <br /> i <br /> ELECT OFFSET 4 7G SUMP 9��: •. R .. . O� <br /> �F..CA`�F <br /> VENT SUPPORT RACK <br /> NO PENITRATION 42 " ONDUIT TO INTRINSICALLY <br /> i Q Q AFE GUTTER AT MONITOR <br /> VENT SUPPORT RACK z I 8 3 CONTROL PANEL 0 PER TANK) 31 103 2"x24"FL�NNECTOR <br /> 1"CONDUIT 2"FLEX 18" 44 1" ONDUIT TO FILL/VAPOR 5g MALE B FEMALE WIVEL PROJECT NUMBER: PROJECT DATE: <br /> o I �MP JUNCTION BOX Q 20-016 05-04-2020 <br /> G„ PENETRATION BOOTS �ONDUIT TO ELECT. PANEL 110 BARBED FITTINGS <br /> ACK SYSTEM FOR UMP POWER) VACUUM HOSE <br /> RACK <br /> SYSTEM <br /> 112 PENETRATION BOOT SHEET CONTENTS: <br /> THIS PIPE TO FILL SUMP <br /> 12"SQUARE <br /> (TYP OF 2) PAINT ALL SUMP SENSOR, INSTALL AT LOWEST 8 DIESEL TANK SUMPS <br /> EXPOSED <br /> POINT TO ENSURE LIQUID DETECTION 51G TEST PORT WITH CONNECTION <br /> AT EARLIEST POSSIBLE MOMENT VENT DETAILS <br /> OUR INSTALLATION IS SIMILAR TO THIS. WE ONLY HAVE PIPING HOSE AND CAP <br /> NOTE: <br /> 2 VENTS TO CONNECT,87 UNLEADED AND 91 UNLEADED. 30" MIN,ABOVE ROOF OF ANY FIBERGLASS CONTAINMENT <br /> SEE DETAIL 12/FS5.0 STRUCTURE WITHIN 10' SUMP TO TANK COLLAR INSIDE <br /> AND OUT TO INSURE WATER <br /> i TIGHTNESS <br /> SHEET NUMBER: <br /> 20 CANISTER AT VENT RISER 12 VENT RISER 8 DIESEL TURBINE CONTAINMENT - VIEW ELEVATION <br /> SCALE: N.T.S. SCALE: N.T.S. SCALE: 3/4" = 1'-0" FS5mO <br />
The URL can be used to link to this page
Your browser does not support the video tag.