My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 ARCADIS REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_2023 ARCADIS REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:25:53 AM
Creation date
11/22/2023 8:56:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 ARCADIS REPORT
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TGI — Indoor Air, Ambient Air, Sub-Slab Vapor, and Soil Vapor 04ARCADIS <br /> Sampling for Analysis via USEPA Compendium Method TO-10A <br /> Rev: 0 1 Rev Date: March 10, 2023 <br /> 1 Introduction <br /> This document describes specific procedures and considerations to be used by Arcadis staff to collect indoor <br /> air, ambient air, sub-slab vapor, and soil vapor using polyurethane foam (PUF) cartridges for low volume <br /> methods. This sampling method allows for analysis of polychlorinated biphenyls (PCBs) and pesticides using <br /> United States Environmental Protection Agency (USEPA) Compendium Method TO-10A(Method TO-10A) by <br /> Soxhlet extraction (Method 3540C). PUF sampling methods are not often used, and their utility should be <br /> thoroughly vetted with the project team, technical experts, and any applicable regulatory agencies prior to <br /> executing a project. <br /> 2 Intended Use and Responsibilities <br /> This document describes general and/or specific procedures, methods, actions, steps, and considerations to be <br /> used and observed by Arcadis staff when performing work, tasks, or actions under the scope and relevancy of <br /> this document. This document may describe expectations, requirements, guidance, recommendations, and/or <br /> instructions pertinent to the service, work task, or activity it covers. <br /> It is the responsibility of the Arcadis Certified Project Manager(CPM)to provide this document to the persons <br /> conducting services that fall under the scope and purpose of this procedure, instruction, and/or guidance. The <br /> Arcadis CPM will also ensure that the persons conducting the work falling under this document are appropriately <br /> trained and familiar with its content. The persons conducting the work under this document are required to meet <br /> the minimum competency requirements outlined herein, and inquire to the CPM regarding any questions, <br /> misunderstanding, or discrepancy related to the work under this document. <br /> This document is not considered to be all inclusive nor does it apply to all projects. It is the CPM's responsibility to <br /> determine the proper scope and personnel required for each project. There may be project- and/or client-and/or <br /> state-specific requirements that may be more or less stringent than what is described herein. The CPM is <br /> responsible for informing Arcadis and/or Subcontractor personnel of omissions and/or deviations from this <br /> document that may be required for the project. In turn, project staff are required to inform the CPM if or when <br /> there is a deviation or omission from work performed as compared to what is described herein. <br /> In following this document to execute the scope of work for a project, it may be necessary for staff to make <br /> professional judgment decisions to meet the project's scope of work based upon site conditions, staffing <br /> expertise, regulation-specific requirements, health and safety concerns, etc. Staff are required to consult with the <br /> CPM when or if a deviation or omission from this document is required that has not already been previously <br /> approved by the CPM. Upon approval by the CPM, the staff can perform the deviation or omission as confirmed <br /> by the CPM. <br /> 3 Scope and Application <br /> This Technical Guidance Instruction (TGI)document describes the methods and procedures to conduct indoor air, <br /> ambient air, sub-slab vapor, and soil vapor sampling for Method TO-10A using a PUF sorbent cartridge with a <br /> GilAir-5 Sampling Pump (or equivalent). A quartz fiber filter may also be used in conjunction with the PUF sorbent <br /> cartridge. The low volume method is used for the collection of PCBs and pesticides in air via TO-10A. There is a <br /> Printed copies of this Technical Guidance Instruction are uncontrolled. Page 4 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.