Laserfiche WebLink
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-00XX 18 <br />FORWARD, INC. <br />FORWARD LANDFILL <br />SAN JOAQUIN COUNTY <br />Monitoring Point Device <br />Type <br />Program Monitored <br />Unit <br />Status <br />LY-Pond-N, LY-Pond-S Suction <br />Lysimeter <br />Detection F West Operational <br />LY-BG-1 Suction <br />Lysimeter <br />Background Forward Unit Operational <br />LY-A, -E1A, -E1B, -E2A, - <br />E2B, <br />D93A, D93B <br />FU-03, -04W-A, -04W-B, - <br />04E-A, -04E-B, -05-A, -05-B, <br />-06-A, -06-B <br />Suction <br />Lysimeter <br />Detection Forward Unit Operational <br />D-01S, -01N, -02 <br />FU-03, -04W, -04E, -05, -06 <br />Pan <br />Lysimeter <br />Detection Forward Unit Operational <br />See Glossary for definitions of terms and abbreviations in table. <br />51.As of the date of this Order, the Facility’s surface water monitoring network <br />consists of the existing and proposed monitoring points listed in Table 5. See <br />Monitoring Network Map in Attachment D. <br />Table 5—Surface Water Monitoring Network <br />Monitoring <br />Point <br />Location Program Status <br />FSW-1 South Fork Littlejohns Creek Discharge (Downstream)Operational <br />FSW-2 South Fork Littlejohns Creek Background (Upstream)Operational <br />ASW-1 North Fork Littlejohns Creek Background <br />(Upstream)Operational <br />ASW-2 North Fork Littlejohns Creek Discharge <br />(Downstream)Operational <br />See Glossary for definitions of terms and abbreviations in table. <br />52.As of the adoption of this Order, the above-described networks comply with the <br />monitoring requirements of Title 27 (see Title 27, secs. 20415–20435).