Laserfiche WebLink
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-00XX 38 <br />FORWARD, INC. <br />FORWARD LANDFILL <br />SAN JOAQUIN COUNTY <br />Unit Module Closure Date Acreage <br />Stage IC To Be Determined 71 <br />124.Per the Preliminary CPMP, the Discharger proposes closure of Stage IC with an <br />engineered alternative final cover, as specified in Attachment F. <br />125.Scheduled dates for Stages II through Stage V were not submitted. The <br />Discharger will need to submit an updated Preliminary CPMP with estimated <br />scheduled closure dates for the remaining stages. See Section I, Table 17 Item <br />5. <br />126.The Discharger has adequately demonstrated that construction of a final slope in <br />accordance with the Title 27 prescriptive standard would be unreasonably and <br />unnecessarily burdensome in comparison to the proposed engineered <br />alternative. The Discharger has further demonstrated that the proposed <br />engineered alternatives described in Attachment E are not only consistent with <br />the performance goals of the prescriptive standard, as described above, and will <br />afford at least equivalent water quality protections. <br />127.As discussed in Attachment F, the Discharger proposes an evapotranspiration <br />final cover for closure of Stage IC to Stage V. The final cover will consist of 4 feet <br />of soil. <br />128.The proposed final cover slopes specified in Attachment F are within Title 27 <br />limits (i.e., 1¾ horizontal feet for every 1 foot of vertical gain) and supported by a <br />static and dynamic slope stability analysis demonstrating that side slopes will <br />remain stable, both under stable and dynamic conditions, throughout the life of <br />the unit. (See Title 27, section 21750, subd. (f)(5)). The final cover will include a <br />15-foot wide bench at minimum for every 50 feet of vertical gain. (See Title 27 <br />section 21090, subd. (a)). <br />129.The Discharger's proposed final covers, together with any modifications set forth <br />in Attachment F, can proceed with the closure of the WMUs identified in <br />Finding 124. <br />Post-Closure Maintenance & Financial Assurances <br />130.The Discharger's Multi-phased CPMP is the operative document providing for <br />post-closure maintenance of Stage IC through Stage V for the entire post-closure <br />maintenance period of at least 30 years, and until it is demonstrated that the <br />Facility no longer poses a threat to the public health and safety and the <br />environment. (See Title 27, sections 20950 subd. (a)(1), 21180 subd. (a)). <br />131.The CPMP includes cost estimates for closure (Title 27, sections 21820, 22206), <br />post-closure maintenance (sections 22210–22212), and foreseeable corrective