My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 CVRWQCB WASTER DISCHARGE REQUIREMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_2023 CVRWQCB WASTER DISCHARGE REQUIREMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:30:25 AM
Creation date
11/22/2023 10:15:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 CVRWQCB WASTER DISCHARGE REQUIREMENTS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-00XX 54 <br />FORWARD, INC. <br />FORWARD LANDFILL <br />SAN JOAQUIN COUNTY <br />I. Time Schedule—The Discharger shall complete the following tasks in <br />accordance with the specified deadlines: <br />Table 17—Time Schedule <br />Item <br />No. <br />Category Task Deadline <br />1.Construction Submit construction, design <br />plan(s), and updated CQA <br />plans for review and approval <br />in accordance with Section D <br />of this Order, and Section F of <br />the SPRRs. <br />120 Days Prior to <br />Proposed <br />Construction <br />2.Construction Submit construction report(s) <br />for review and approval upon <br />completion demonstrating <br />construction was in <br />accordance with approved <br />construction plans and <br />Section F.27 of the SPRRs. <br />60 Days Prior to <br />Proposed Discharge <br />to Unit(s) <br />3.Final Closure Submit final or partial final <br />closure and post-closure <br />maintenance plan (PCMP), <br />design plans, and CQA plan <br />for review and approval, in <br />accordance with Section E of <br />this Order and Section G of <br />the SPRRs. <br />2 Years Prior to <br />Closure <br />4.Surface Impoundment <br />Construction <br />Submit design report and <br />CQA plan of WMU F South <br />and WMU F East for review <br />and approval, prior to <br />discharging waste into the <br />unit. A revised Operation and <br />Maintenance plan must also <br />be submitted after <br />construction has been <br />completed. <br />120 Day Prior to <br />Proposed <br />Construction
The URL can be used to link to this page
Your browser does not support the video tag.