My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 CVRWQCB WASTER DISCHARGE REQUIREMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_2023 CVRWQCB WASTER DISCHARGE REQUIREMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:30:25 AM
Creation date
11/22/2023 10:15:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 CVRWQCB WASTER DISCHARGE REQUIREMENTS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-00XX 63 <br />FORWARD, INC. <br />FORWARD LANDFILL <br />SAN JOAQUIN COUNTY <br />ATTACHMENT F—APPROVED FINAL CLOSURE DESIGN <br />1.Prescriptive Final Cover <br /> <br />2.Engineered Alternative 1 <br />3.Engineered Alternative 2 <br /> <br /> <br />Component Top Deck and Side Slopes <br />Erosion Resistant Layer Minimum 1-foot vegetative cover soil <br />Low Hydraulic Conductivity <br />(LHC) Layer <br />Minimum 1-foot clean compacted clay soil <br />(k ≤ 1 x 10-6 cm/sec) <br />Foundation Layer Minimum 2-foot thick soil <br />Component Top Deck and Side Slope <br />Cover Layer 3-foot thick select soil material for upper monolithic cover <br />layer <br />Foundation Layer 1-foot thick select soil materials placed as interim cover <br />Component Top Deck and Side Slope <br />Cover Layer and <br />Foundation Layer <br />4-foot thick select soil material for upper monolithic cover <br />layer and foundation layer
The URL can be used to link to this page
Your browser does not support the video tag.