Laserfiche WebLink
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-00XX 80 <br />FORWARD, INC. <br />FORWARD LANDFILL <br />SAN JOAQUIN COUNTY <br />STANDARD PROVISIONS & REPORTING REQUIREMENTS <br />28.The Discharger shall not discharge waste onto a newly constructed liner <br />system until the final documentation report has been reviewed and an <br />acceptance letter has been received. <br />29.Prior to placement of waste in a new landfill unit, the Discharger shall <br />monitor any pan lysimeter for the unit that has received enough rainfall to <br />flood the LCRS sump. If liquid is detected in the pan lysimeter, the <br />Discharger shall verify that the liquid is not from a leak in the primary liner <br />system before waste can be accepted to the new module. <br />G.Standard Closure and Post-Closure Specifications <br />1.The Discharger shall submit a final or partial final closure and post-closure <br />maintenance plan at least two years prior to the anticipated date of <br />closure [Title 27, § 21780(d)(1)]. <br />2.The Discharger shall notify the Central Valley Water Board in writing that a <br />landfill unit or portion of a unit is to be closed either at the same time that <br />the California Department of Resources Recycling and Recovery <br />(CalRecycle) is notified or 180 days prior to beginning any final closure <br />activities, whichever is sooner [Title 27, § 21710(c)(5)(A)]. The notice shall <br />include a statement that all closure activities will conform to the most <br />recently approved final or partial final closure plan and that the plan <br />provides for site closure in compliance with all applicable federal and state <br />regulations [Title 27, § 21710(c)(5)(C)]. <br />3.Initiation of closure activities shall begin within 30 days of final waste <br />receipt, or within one year of receipt of most recent waste if additional <br />capacity remains [40 C.F.R. § 258.60(f)]. <br />4.Closure activities shall be completed within 180 days of the beginning of <br />closure activities unless an extension is granted by the Executive Officer <br />[40 C.F.R. § 258.60(g)]. <br />5.The Discharger shall carry out both mandatory closure and normal closure <br />of a waste management unit or a portion of a unit in accordance with a <br />closure and post-closure maintenance plan approved by the Central <br />Valley Water Board [Title 27, § 20950(a)(1)] through the issuance of <br />closure waste discharge requirements. <br />6.The Discharger shall notify the Central Valley Water Board that a <br />preliminary closure and post-closure maintenance plan has been prepared <br />and placed in the operating record by the date of initial receipt of waste at <br />any new MSW landfill unit or lateral expansion of any existing unit [40