Laserfiche WebLink
DRAFT [TENTATIVE] MONITORING & REPORTING PROGRAM R5-2023-XXXX 24 <br />FORWARD, INC. <br />FORWARD LANDFILL <br />SAN JOAQUIN COUNTY <br />Well Monitored Units <br />EW-4 Forward Unit <br />EW-5 Forward Unit <br />CDCR- <br />EW-1 <br />California Department <br />of Corrections and <br />Rehabilitation <br />See Glossary for definitions of terms and abbreviations in table. <br />a. Additional groundwater extraction wells are to be installed following <br />the ongoing compliance with Cleanup and Abatement Order (CAO) <br />R5-2017-0703. Extraction wells installed as a result of the CAO’s <br />requirements will be tested for the five-year COC list and follow a <br />specified sampling schedule following the initial results. <br />4. Landfill Gas Corrective Action—The Facility’s landfill gas (LFG) <br />corrective action system currently consists of the monitoring system seen <br />in Table 21. The Discharger shall log all system shutdowns (including <br />causes and stop/start dates), monthly downtime and monthly runtime. All <br />shutdowns, regardless of the type of restart, shall be recorded. This <br />information shall be reported semiannually per Section E.1 and sampling <br />locations shall be clearly labeled in report (sampling port identification). <br />Additionally, system performance shall be monitored in accordance with <br />Table 20. <br />Table 20—Landfill Gas Corrective Action Monitoring, <br />Control System Performance <br />Parameter Units Sampling <br />Freq. <br />Reporting <br />Freq. <br />Control System Runtime Hours N/A Semiannual <br />Control System Downtime %N/A Semiannual <br />Temperature into Plant °F Monthly Semiannual <br />Flare Combustion Temperature °F Monthly Semiannual <br />System Vacuum psi Monthly Semiannual