My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 7 EARTHWORK <br />Sieve Size Percent Passing by Weight <br />No. 4 0-5 <br />No. 200 0-2 <br /> <br /> B. The minimum hydraulic conductivity to water shall be 1.0 cm/sec. <br /> <br /> C. Coarse Gravel Material placed directly on geotextile and around HDPE pipe shall <br />contain no angular particles. <br /> <br /> D. Coarse Gravel Material shall contain no limestone or other material that will <br />adversely react with leachate. <br /> <br /> E. The Coarse Gravel shall be provided by the EARTHWORK CONTRACTOR <br /> <br />2.7 PROTECTIVE OPERATIONS LAYER <br /> <br /> A. The material shall consist of generally sandy material excavated onsite. The <br />material shall be obtained from the onsite borrow area or from excavation of <br />WMU FU-23. Protective operations layer placed directly above geosynthetics <br />shall have no angular particles greater than 1 inch. <br /> <br /> B. The material shall have a permeability greater than 1 x 10-4 cm/sec under a 4.5-psi <br />confining stress. <br /> <br /> <br />2.8 PLYWOOD SHEETING <br /> <br /> A. Plywood sheeting shall be exterior grade and provided at the dimensions shown <br />on the Construction Drawings. <br /> <br />2.9 EQUIPMENT <br /> <br /> A. General: <br /> <br />1. Equipment used in constructing the Work shall be in good working order and <br />shall be operated in strict accordance with manufacturer’s instructions and <br />recommendations. <br />2. Any soils contaminated by discharge of fluids from leaky or faulty equipment <br />shall be removed and properly disposed and the contaminated area backfilled <br />with clean soil, at no cost to the OWNER. <br /> <br /> B. Clay Processing Equipment <br /> <br /> 1. Use clay processing equipment meeting the following requirements: <br />a. Of a type and of sufficient size to process the onsite clay material to <br />meet requirements for maximum clod size and to provide a <br />homogeneously moisture conditioned material.
The URL can be used to link to this page
Your browser does not support the video tag.