My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 11 EARTHWORK <br /> B. The EARTHWORK CONTRACTOR shall selectively stockpile the onsite fine- <br />grained material to use as Clay Liner or Clay Earthfill Material. The <br />EARTHWORK CONTRACTOR shall also selectively stockpile material <br />appropriate for use as protective operations layer. <br /> <br /> C. Soils to be excavated are variable. Fine-grained material suitable for use as the <br />Clay Liner or Clay Earthfill material may only be encountered in thin intermittent <br />seams. <br /> <br /> D. The EARTHWORK CONTRACTOR shall make all reasonable efforts to <br />determine the type of soil being excavated at all times. Equipment operators or <br />the EARTHWORK CONTRACTOR's representative directing excavation shall <br />have sufficient knowledge and understanding of soil classifications to determine <br />general soil type. <br /> <br /> E. The EARTHWORK CONTRACTOR shall stockpile excavated material in <br />accordance with Section 3.6 of this Specification and shall direct equipment <br />operators to the appropriate stockpile area depending on the soil classification of <br />most of the material that makes up the excavation equipment's payload. <br /> <br /> F. Refuse may be encountered in some excavation areas. The EARTHWORK <br />CONTRACTOR shall notify the DESIGN ENGINEER and QA/QC <br />CONSULTANT if refuse is encountered in areas other than at tie-ins/connections <br />to existing WMUs at the site. The DESIGN ENGINEER will provide guidance <br />on the depth the refuse shall be excavated and the appropriate backfill procedures. <br /> The EARTHWORK CONTRACTOR shall dispose of the excavated refuse in the <br />active portion of the landfill or as directed by the OWNER. <br /> <br /> G. Excavation to be carried out for the convenience of the EARTHWORK <br />CONTRACTOR shall conform to the limits approved by the DESIGN <br />ENGINEER, QA/QC CONSULTANT, and OWNER and shall be at no additional <br />expense to the OWNER. <br /> <br /> H. Excavated material shall be placed a sufficient distance from the edge of <br />excavations to prevent cave-ins or bank slides. <br /> <br /> I. The CONTRACTOR shall excavate to sufficient lines and grades to construct the <br />compacted clay liner and sumps as shown on the Construction Drawings and <br />described in these Specifications. <br /> <br /> J. Shape, trim, and cut ditches and other drainage structures as necessary to achieve <br />grades and dimensions shown on the Construction Drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.