My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 35 <br /> <br />Test Results. The QA/QC Consultant will examine all results from laboratory acceptance testing <br />and will report any nonconformance to the Construction Manager. <br /> <br />Acceptance Test Failure. If a Geotextile acceptance sample does not comply with the minimum <br />requirements of the Specifications, the Geotextile roll from which the sample was taken will be <br />failed by the QA/QC Consultant and replaced by the Geotextile Manufacturer at no additional cost to <br />the Owner. The Design Engineer shall be contacted to determine additional acceptance testing <br />requirements. <br /> <br /> <br />4.3.3 Geotextile Installation <br /> <br />Surface Preparation. Before geotextile installation, the QA/QC Inspector will: <br /> <br />• Verify that all lines and grades have been verified by the Contractor. <br />• Verify that all seaming and required testing of the HDPE geomembrane underlying the <br />cushion geotextile has been completed. <br /> <br />• Verify that the granular drainage material underlying the filter geotextile has been placed <br />to the required thickness. <br /> <br />Geotextile Placement and Seaming. During geotextile placement and seaming operations, the <br />QA/QC Inspector will: <br /> <br />• Observe the geotextile as it is deployed and record all defects and defect corrective <br />actions (panel rejected, patch installed, etc.). Verify that corrective actions are <br />performed in accordance with the specifications. <br /> <br />• Verify that equipment used does not damage the geotextile by handling, equipment <br />transit, leakage of hydrocarbons, or other means. <br /> <br />• Verify that crews working on the geotextile do not smoke, wear shoes that could damage <br />the geotextile, or engage in activities that could damage the geotextile. <br /> <br />• Verify that adjacent panels are overlapped or seamed in accordance with the <br />Specifications. <br /> <br />• Verify that the geotextile was not exposed to direct sunlight for more than 5 days. <br /> <br />• Examine the geotextile after installation to ensure that no potentially harmful foreign <br />objects are present. <br />
The URL can be used to link to this page
Your browser does not support the video tag.