My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 41 <br />• GCLs will be cut using a utility knife in a manner approved by the QA/QC Inspector. <br />Care should be taken to prevent damage to any underlying liner system components <br />during cutting. <br />• During placement, care will be taken not to entrap stones, or moisture under the GCL. <br />Care will be taken not to drag equipment across the exposed GCL. <br />• Any GCL damaged by stones or other foreign objects, or installation activities will be <br />replaced at no additional cost to the Owner. <br />• The GCL will not be installed on a saturated subgrade or on standing water. The GCL <br />will be installed in a way that prevents hydration of the mat prior to completion of <br />construction of the liner system. <br />• The GCL will not be installed during precipitation or other conditions that may cause <br />hydration of the GCL. <br />• The GCL will be installed with the woven geotextile up, or as otherwise indicated by the <br />GCL Manufacturer or Design Engineer. <br />• Geomembrane installation will immediately follow the GCL installation. All GCL that <br />is placed during a day's work will be covered with geomembrane before the <br />Geosynthetics Contractor leaves the site at the end of the day. <br />• Geomembrane will not be placed on a GCL that is hydrated. <br />• All seams in the geomembrane overlying a GCL will be welded after each geomembrane <br />panel is placed. Heat sealing of the seam alone is not acceptable. <br />• All defects in the geomembrane overlying a GCL and destructive sample locations will <br />be immediately repaired. <br />• Operations layer soil overlying the liner system components shall immediately follow the <br />installation of the geomembrane and other geosynthetics overlying the GCL. If areas <br />cannot be covered immediately due to steepness of slopes, visqueen or equivalent shall <br />be placed over any exposed GCL. The GCL shall be removed and replaced if it becomes <br />hydrated before the operations layer soil is placed. <br />• All hydrated GCL will be removed and replaced by the Geosynthetics Contractor at no <br />additional cost to the Owner. <br />• On slopes steeper than 10 horizontal to 1 vertical, all GCLs shall be continuous down the <br />slope; that is, no horizontal seam shall be allowed in the slope.
The URL can be used to link to this page
Your browser does not support the video tag.