My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 43 <br /> <br /> 5 CONSTRUCTION QUALITY ASSURANCE FOR HDPE <br />PIPE AND TANKS <br />5.1 Introduction <br /> <br />This section describes CQA procedures for high density polyethylene (HDPE) pipe and tank <br />installations. Perforated and solid HDPE pipe will be utilized to construct the leachate collection <br />and recovery systems. <br /> <br />CQA for the HDPE pipe and tank installations will be performed to verify that HDPE pipe systems <br />and tanks are installed in accordance with the design. Construction must be conducted in accordance <br />with the Construction Drawings and Specifications. To monitor compliance, the CQA program will <br />(1) review the Contractor’s quality control submittals; (2) monitor construction testing; and (3) <br />monitor installations. <br /> <br />All construction testing will be conducted in accordance with the Specifications. <br /> <br />5.2 Construction Monitoring <br /> <br />The following sections list monitoring requirements during HDPE pipe and tank operations. <br /> <br />5.2.1 Delivery, Handling, and Storage <br /> <br />• Verify that chains, end hooks, cable slings, or any other devices that may scar the pipe <br />or tank are not used for handling. Wide nylon web slings are recommended to handle the <br />pipe. <br /> <br />• Verify that the pipe or tanks are not damaged during handling operations and that <br />damaged pipe or tanks are separated from accepted materials. <br /> <br />• Verify that pipe out-of-roundness will not occur due to excessive stacking heights when <br />the pipe is stored at the site. Recommended stacking heights for pipe are provided in the <br />following chart: <br />
The URL can be used to link to this page
Your browser does not support the video tag.