My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 50 <br /> <br />• As-built record drawings. <br /> <br />• A statement that the interface shear strength meet or exceed the specified requirements. <br />If the interface shear strength results do not meet or exceed the specified requirements, <br />contact the Design Engineer and append a revised stability analysis, prepared by the <br />Design Engineer. <br /> <br />• A statement of compliance with the construction contract documents and design intent <br />signed and stamped by the QA/QC Manager, a professional engineer registered in the <br />state of California. <br /> <br />The as-built record drawings will accurately locate the constructed location of all work items, <br />including the edge of geomembrane, location of piping, anchor trenches, etc. All surveying and base <br />maps required for the development of the record drawings will be prepared by the Contractor and the <br />Owner. The QA/QC Manager must review and verify that as-built drawings are correct. As-built <br />record drawings will be included in the final CQA report.
The URL can be used to link to this page
Your browser does not support the video tag.